My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028 - Approving General Plan Amendement No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-028 - Approving General Plan Amendement No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 9:24:38 AM
Creation date
6/11/2014 12:36:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-028
Date
6/3/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana -Park View at Town and Country Manor <br />Draft EIR Utilities and Service <br />Both sewer facilities have adequate capacity to meet the project's sewer discharge needs (Vakili <br />2008). <br />A sewer capacity analysis from the Applicant will be required by the City to fully evaluate impacts to <br />wastewater facilities from the proposed project. The Applicant/Developer will be required to provide <br />all onsite sewer infrastructure and pay appropriate sewer system connection fees. City requirements <br />will ensure that sewer facilities are sized appropriately, and that wastewater treatment requirements of <br />the RWQCB are not be exceeded. <br />The project would not exceed wastewater treatment requirements of the applicable Regional Water <br />Quality Control Board. The project would result in a determination by the wastewater treatment <br />provider which serves the project that it has adequate capacity to serve the project's projected demand <br />in addition to the provider's existing commitments. Lastly, the project would not require or result in <br />the construction of new water or wastewater treatment facilities or expansion of existing facilities, the <br />construction of which could cause significant environmental effects. Impacts are, therefore, less than <br />significant. <br />Level of Significance Before Mitigation <br />Less than significant. <br />Mitigation Measures <br />No mitigation measures required. <br />Level of Significance After Mitigation <br />Less than significant. <br />Stormwater Drainage Facilities <br />Impact 4.7 -2 The project would not require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, the construction of which <br />could cause significant environmental effects. <br />[CEQA Utilities and Service Systems Threshold 16(c)] <br />Impact Analysis <br />Existing drainage facilities serving the Town and Country Manor and surrounding area have been <br />planned and constructed to accommodate runoff from development on the project site. A project <br />Hydrology Study as well as a Drainage Plan, identifying the exact size and location of drainage <br />facilities, will be prepared and submitted to the City of Santa Ana for review and approval. The <br />proposed project can be considered part of the master planned mixed use area containing the Main <br />Place Mall and City Place development. Development intensity in this location is increasing, and <br />storm drain facilities are being upgraded accordingly. Increased runoff volumes and velocities for the <br />project site will be reduced through BMPs discussed in Hydrology and Water Quality Impact 4.5 -1 <br />and detailed in the project Preliminary WQMP contained in Appendix C. Runoff will be stored and <br />Michael Brandman Associates 4.7 -5 <br />H\Cl t(PN- JMb327b32]003MMVB2]0030 Sec 7UNifiesa dService SyAa sdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.