My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (28) - 2014
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (28) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 2:33:10 PM
Creation date
6/13/2014 10:31:00 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
N-2014-075
Agency
POLICE
Expiration Date
9/29/2015
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. "Contractor Security Cleuealldte' and "Orange County Jail Roleam: of Liability" <br />information farms will be provided by the County Project Manager upon request and <br />Will be screened by the Sberift's Department. <br />8. "Contrtct Security Clearance" and "Orange County Jail Release Of Liability" <br />infomlation farms. shall be thoroughly and accurately completed, Omissions or false <br />statements, regardless of the nature or magnitude, may be grounds for denying <br />clearance. <br />9. The Orange Comity Sheriff Department will not give the reason an individual's <br />Clearance is denied. <br />F. GENERAL SEGURITY REQUIREMENT -AT WORKSITE; <br />L All Work areas shall be secured prior to the cad of each workday. <br />2. Workmen shall have no contact, either verbal or physical, with itunales in the facility. <br />Specifically: <br />a, Do not give names or addresses to inmates. <br />b. Do not receive any m Mees or.addresses from inmates. <br />c. Do. not discloseth0dentityotanyinmate toanyoneOutside ;the.facility, <br />d. Domot give any niatdrials to tannates. <br />e. Do not receive any malerials from inmates (including materials to be passed to <br />another individual or iunlate), <br />3. Contractor's personnel shall not smoke or use profanity or other inappropriate language <br />while on site. <br />A. Coatractoes personnel do not cater the facility while under the influence of alcohol, <br />drugs or other intoxicants and do not have such materials it) their possession. <br />5. Faihtrc to comply with these requirements is n criminal act and can result in <br />prosecution. <br />G. Contractor's personnel shall plan their aedvities to minimize the nullher of times -they <br />must enter and exit a facility, i.e., transport all tools; equipment, and materials needed <br />for the day at the start of work and restrict a8 breaks to the absolute minimum. <br />7. Contractor's personnel shall fallow oily special semuity requirdments issued by the <br />onsite contact person or escort Dcp uty. <br />8. Contractor's personnel shall report either to the ou-site contact person when leaving the <br />facility, temporarily or at the and of the workday. <br />Blackboard Crnnec4 hie. coiaroCtor tnttinL• ! <br />file bolder VS420 15 Conino0 MA -00-1301 t688 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.