My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - BRISTOL ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
07/01/2014
>
55C - RESO - BRISTOL ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 3:34:35 PM
Creation date
6/26/2014 2:56:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
7/1/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17fb Street <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />3.2 Agricultural Resources <br />The previously approved 1990 FEIS /EIR did not include evaluation for agricultural resources, as no <br />agricultural resources are located within the area of analysis. <br />a.) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), <br />as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of <br />the California Resources Agency, to non - agricultural use? <br />The Project site is located within a highly urbanized area of the City of Santa Ana. No Prime, Unique, or <br />Farmland of Statewide Importance is located in the vicinity of the Project site. No impacts would result <br />from the proposed Project. The proposed Project would not result in greater impacts than previously <br />analyzed in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />b.) Conflict with existing zoning for agricultural use, or a Williamson Act contract? <br />The Project site is located within a highly urbanized area in the City of Santa Ana. Lands within the <br />Project area are designated General Commercial as identified in the City of Santa Ana's General Plan. <br />The zoning designation of properties within the Project area is Specific Plan (SP1) which allows for a <br />variety of land uses such as commercial, office, residential and open space as provided in the approved <br />Specific Plan document. No agricultural uses exist on site or in the vicinity, and the Project would not <br />conflict with a Williamson Act contract as none exist in the Project area. The proposed Project would not <br />result in greater impacts than previously analyzed in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />c.) Conflict with existing zoning for, or cause rezoning, of forest land (as defined in Public <br />Resources Code section 12220(g)), timberland (as defined by Public Resources Code section <br />4526), or timberland zoned Timberland Production (as defined by Government Code section <br />51104(g))? <br />The Project site is located within a highly urbanized area in the City of Santa Ana. Lands within the <br />Project area are designated General Commercial as identified in the City of Santa Ana's General Plan. <br />The zoning designation of properties within the Project area is Specific Plan (SP1) which allows for a <br />ANA It t -334 (PER -02 -0I) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 20 <br />55C -35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.