Laserfiche WebLink
ENVIRONMENTAL IMPACTREPORT ADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17fb Street <br />a variety of land uses such as commercial, office, residential and open space as provided in the approved <br />Specific Plan document. The proposed Project would not result in changes to the land use designation of <br />the acquired parcels. The proposed Project is in compliance with the existing designation and would not <br />create a new conflict. No significant impact is anticipated. Impacts would be similar to those identified in <br />the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Conflict with any applicable habitat conservation plan or natural community conservation plan? <br />The Project site is not a part of any habitat conservation plan, and is located within a highly urbanized <br />area within the City of Santa Ana. The proposed widening would not conflict with any habitat <br />conservation plan or natural community. No impact is anticipated. Impacts would be similar to those <br />identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />3.11 Mineral Resources <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsection W - Consumption of Renewable and Non - Renewable Resources of the 1990 FEIS /EIR. <br />a.) Result in the loss of availability of a known mineral resource that would be of value to the region <br />and the residents ofthe state? <br />The Project site is currently developed and does not contain any areas that are utilized for the extraction <br />of mineral resources. Furthermore, the proposed Project would not involve excavation that would likely <br />identify previously unidentified mineral resources. No impact to mineral resources would result from the <br />proposed Project. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Result in the loss of availability of a locally- important mineral resource recovery site delineated <br />on a local general plan, specific plan or other land use plan? <br />The Project site is currently developed and is not delineated as a mineral resources recovery site by the <br />City of Santa Ana General Plan. hnplementation of the proposed Project would have no impact on the <br />mineral resources and no mitigation measures are necessary. Impacts would be similar to those identified <br />in the 1990 FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 RrV2) 132897 CM PAGE42 <br />55C -57 <br />