My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - BRISTOL ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
07/01/2014
>
55C - RESO - BRISTOL ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 3:34:35 PM
Creation date
6/26/2014 2:56:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
7/1/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDLIM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17`" Street <br />the proposed Project may interfere with emergency access in the short -term, it would improve emergency <br />access once the Project is completed. The proposed Project would not result in impacts to emergency <br />access beyond those previously identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />f.) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian <br />facilities, or otherwise decrease the performance or safety of such facilities? <br />The proposed Project would not conflict with any alternative transportation plan, and would 'increase <br />safety associated with improvements to the traffic operations through the Project corridor. The proposed <br />Project would not result in impacts greater than as described in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />3.17 Utilities and Service Systems <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsections S - Effect on Utilities, and V - Construction Impacts of the 1990 Final EIS /EIR. <br />a.) Exceed wastewater treatment requirements of'the applicable Regional Water Quality Control <br />Board? <br />The proposed Project would not generate wastewater. No new significant impact is anticipated. No <br />impacts are anticipated in this regard. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Require or result in the construction of new water or wastewater treatment.facilities or expansion <br />of'existing facilities, the construction of which could cause significant environmental effects? <br />The proposed road widening Project would not require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing facilities. The existing sewer and water lines <br />beneath Bristol Street would not be relocated. No new significant impact is anticipated. Impacts in this <br />regard would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 50 <br />55C -65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.