My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - SANITARY SEWER SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
07/15/2014
>
25E - AGMT - SANITARY SEWER SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 4:44:28 PM
Creation date
7/10/2014 2:48:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
7/15/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation Plan <br />i <br />r Every line inspected is checked for quality, accuracy and confirms all contract requirements <br />are met. <br />i <br />Data inserted in the database is checked for accuracy, compared to the City's Map and to j <br />AeA an Excel Spreadsheet, supplied by the City, which includes all line segments for the entire <br />sewer system. During this process we check the awash logs ensuring they match the sewer <br />lines inspected that particular day. Once all data is verified to be correct the QC process <br />begins. <br />Our QC tech views each video in its entirety first checking for proper lighting and centering <br />of the camera. The video must have a clear picture, free of any kind of distortion or <br />interferences and the audio must be clear and concise. Every line must also begin with a <br />view of the open manhole proceeding uninterrupted in the downstream direction with the <br />insertion of the camera into the manhole. <br />All sewer lines are inspected using NASSCO's standard coding system. During the QC <br />° process all lines are checked for the proper logging of each defect. All defects must be <br />accurately coded using the proper NASSCO code, o -clock position(s) and footage. The <br />inspection shall include location of all laterals, cracks, roots, deposits, infiltration, ex- filtratlon <br />and other conditions pertaining to the sewer line. If during the QC process the line is deemed <br />to be unsatisfactory, the line is rejected and re- Inspected. Aft-or the lines have passed the <br />QC process they are saved on multiple hard drives ensuring nothing is lost if the working <br />hard drive should fail. <br />Once this step is complete all lute segments are logged on an Excel Spreadsheet. This <br />spreadsheet shows progress of our current task and includes important information, we feel <br />the City should be aware of; including RVP information, Red Flags, etc. Any lines having <br />city of Santa Aria aid 917-020 <br />Clasod CUCUIt Yalemsion �CG'Nj L+apnclian of 6wWry Sawors <br />t-z .— - sy 21831 Barton Roaa <br />H✓,/h� Grand Terrace, CA 92717 <br />ARRIS .. - gog.12289Sa P 9o9422 mU t F <br />25E -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.