5108, and has an AA degree in surveying from Santa Rosa College. Ms, del Castillo has had
<br />extensive experience in boundary analysis, preparation and checking of legal descriptions and
<br />maps, Corner Records, checking of final subdivision maps and Records of Surveys, research,
<br />as well as providing internal checking and quality control. Ms, del Castillo has also had
<br />extensive experience In field note reduction, calculations, preparation of as -built plans, and
<br />GIS database setup, Input, review, analysis and output, Nis, dei Castillo was responsible for
<br />the preparation and processing of centerline ties & Corner Records, as well as several
<br />Records of Survey.
<br />PROJECT SURVEYOR FIELD SURVEY MANAGER
<br />Ken Kasbohm has over thirty-six years of surveying experience, the last 23 years with Coast,
<br />in the field and directing field crews in performing all types of surveying including vertical and
<br />horizontal control, ,photo control, GPS surveys, topographic surveys, design surveys, boundary
<br />surveys, right of way surveys, and construction layout, Mr. Kasbohm is a Professional Land
<br />Surveyor In California since 1997 as. P.L.S. 7871; has been a Certified Party Chief since 1985,
<br />and has been Hazmat trained since 1936. Mr. Kasbohm directs the work of the field crews,
<br />sets up the work for each crew, and has continued to work as a survey party chief as needed.
<br />During the last few years, he has been responsible for the preparation of numerous Records
<br />of Survey for MWD properties along the Colorado River Aqueduct,
<br />1MPLEM,EMTATION PLAN
<br />CONSTRUCTION STAKING APPROACH
<br />Prior to the start of construction and after construction has been completed, we will perform
<br />monument preservation services as noted above.
<br />Our general approach will be to review the construction plans, specifications and standard
<br />plans, compute the locations of all improvements to be staked prior to construction, mark
<br />removal limits, stake the locations of items to be constructed on an agreed upon offset (such
<br />aw slope staking; rough grade; fine grade, rock grade, and/or finished surface; curb, -curb &
<br />gutter, and/or edge of pavement; drainage structures; storm drain lines and manholes; water
<br />lines; fire hydrants; sewer lines and manholes; utilities, bridge structures; light poles; and
<br />signal poles), checking Into existing improvements as needed.
<br />We will work closely with the Resident Engineer and City staff to coordinate the construction
<br />staking operations, and report any Issues to the Resident Engineer. We will re -stake items
<br />only as directed by the Resident Engineer and keep separate track of those particular hours.
<br />SUSDIVISION MAP CHECKING APPROACH
<br />Our approach will be to review tentative maps, final maps, easement deeds and lot line
<br />adjustments using our detailed, working knowledge of the Subdivision Map Act, the Land
<br />Surveyor's Act, proper legal description preparation and map checking procedures utilized in
<br />the City of Santa Ana and the County of Orange for compliance with the Subdivision Map Act,
<br />the Land Surveyor's Act and the Conditions of Approval as set by the City staff, commissions
<br />and the City Council,