Laserfiche WebLink
5108, and has an AA degree in surveying from Santa Rosa College. Ms, del Castillo has had <br />extensive experience in boundary analysis, preparation and checking of legal descriptions and <br />maps, Corner Records, checking of final subdivision maps and Records of Surveys, research, <br />as well as providing internal checking and quality control. Ms, del Castillo has also had <br />extensive experience In field note reduction, calculations, preparation of as -built plans, and <br />GIS database setup, Input, review, analysis and output, Nis, dei Castillo was responsible for <br />the preparation and processing of centerline ties & Corner Records, as well as several <br />Records of Survey. <br />PROJECT SURVEYOR FIELD SURVEY MANAGER <br />Ken Kasbohm has over thirty-six years of surveying experience, the last 23 years with Coast, <br />in the field and directing field crews in performing all types of surveying including vertical and <br />horizontal control, ,photo control, GPS surveys, topographic surveys, design surveys, boundary <br />surveys, right of way surveys, and construction layout, Mr. Kasbohm is a Professional Land <br />Surveyor In California since 1997 as. P.L.S. 7871; has been a Certified Party Chief since 1985, <br />and has been Hazmat trained since 1936. Mr. Kasbohm directs the work of the field crews, <br />sets up the work for each crew, and has continued to work as a survey party chief as needed. <br />During the last few years, he has been responsible for the preparation of numerous Records <br />of Survey for MWD properties along the Colorado River Aqueduct, <br />1MPLEM,EMTATION PLAN <br />CONSTRUCTION STAKING APPROACH <br />Prior to the start of construction and after construction has been completed, we will perform <br />monument preservation services as noted above. <br />Our general approach will be to review the construction plans, specifications and standard <br />plans, compute the locations of all improvements to be staked prior to construction, mark <br />removal limits, stake the locations of items to be constructed on an agreed upon offset (such <br />aw slope staking; rough grade; fine grade, rock grade, and/or finished surface; curb, -curb & <br />gutter, and/or edge of pavement; drainage structures; storm drain lines and manholes; water <br />lines; fire hydrants; sewer lines and manholes; utilities, bridge structures; light poles; and <br />signal poles), checking Into existing improvements as needed. <br />We will work closely with the Resident Engineer and City staff to coordinate the construction <br />staking operations, and report any Issues to the Resident Engineer. We will re -stake items <br />only as directed by the Resident Engineer and keep separate track of those particular hours. <br />SUSDIVISION MAP CHECKING APPROACH <br />Our approach will be to review tentative maps, final maps, easement deeds and lot line <br />adjustments using our detailed, working knowledge of the Subdivision Map Act, the Land <br />Surveyor's Act, proper legal description preparation and map checking procedures utilized in <br />the City of Santa Ana and the County of Orange for compliance with the Subdivision Map Act, <br />the Land Surveyor's Act and the Conditions of Approval as set by the City staff, commissions <br />and the City Council, <br />