My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 4 - 2014
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 4 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:36:31 PM
Creation date
7/22/2014 11:42:34 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2014-101
Agency
PUBLIC WORKS
Council Approval Date
4/15/2014
Expiration Date
6/30/2016
Insurance Exp Date
9/18/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Manage all milestone events on an individual basis, i.e., the team members or <br />subcontractors should not begin a new set of tasks until the milestone for the previous set, of <br />tasks has been met and accepted for quality and adherence to the stated project standards. <br />Cost control is synonymous with qualified staff, technical excellence, quality assurance and <br />good project management. For any assignment Coast will use the following: <br />• Qualified, licensed professional surveyors who are in responsible charge of the work; and <br />technical experts whose qualifications are specific to the task. <br />• All work should be carried out under the direct supervision of a locally licensed land <br />surveyor. <br />• State-of-the-art survey :equipment, survey software, desktop and notebook computers, <br />communications equipment, and the Internet access for transmittal of data and reports. <br />• Quality control provided at all phases of the work. <br />• Hands on survey, mapping, imagining, GIS, modeling and photographic supervision and <br />project management. <br />• Time and cost reporting accounting systems. These costs should be traced on a weekly <br />basis; or on smaller projects track labor costs on a daily basis. <br />• Coordination and communications are equally critical to quality and cost control, <br />• Communications within the team should be conducted on a regular basis in person or via <br />telephone, fax, and/or e-mail, Data files should be transmitted on a daily basis to the <br />project survey to be reviewed and archived. Client communications should be focused <br />through the survey manager: <br />IN AN EVENT A PROJECT IS OFF SCHEDULE <br />All the above mentioned elements of QA/QC plan may not guarantee that a project will be on <br />schedule. If the schedule is off schedule, this QA/QC plan will minimize the issues and <br />corrections needed to bring the project back on schedule. <br />Coast Surveying's approach to bring a project back on schedule at no additional cost to the <br />client: <br />1. Early detection <br />2. Early communication to all concerned, including evaluation of corrective measures, <br />which could include: <br />a. Using additional staff/resources <br />b, Different methods <br />c. Shortening the QA/QC final review time by adding another QA/QC manager. <br />Coast has over the years, developed the project controls, methodology and implementation <br />methods necessary to give our client the surveying information requested safely, tan -Budget <br />and On -Schedule. <br />CONCLUSION <br />Coast Surveying, Inc. Is especially well suited to perform On -Call Surveying Services for the <br />City of Santa Ana: <br />• Project Manager, Ruel del Castillo, P.L.S. 4292, has over 48 years of surveying <br />experience in Orange County; who has been licensed as a Professional Land Surveyor <br />In California since 1975 and who has extensive experience in all aspects of land <br />surveying, especially construction staking and Corner Records. <br />
The URL can be used to link to this page
Your browser does not support the video tag.