My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 4 - 2014
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 4 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:36:31 PM
Creation date
7/22/2014 11:42:34 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2014-101
Agency
PUBLIC WORKS
Council Approval Date
4/15/2014
Expiration Date
6/30/2016
Insurance Exp Date
9/18/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cluality assurance begins with Project Delivery Planning. Technical standards and <br />specifications, defining of deliverable Items, ,and milestone schedules will be identified at the <br />project planning stage. The following guidelines can be used as a general checklist for the <br />main elements of any project work plan. Unless a specific plan is required by the contract, at a <br />minimum the following should be considered as appropriate quality assurance measures: <br />• Detailed statement of work and scope of required services <br />• Milestone Schedules, budgets and milestone points <br />• Precise definition of required deliverables, contract standards, client imposed standards <br />and/or industry standards to be used <br />The use of advanced technology <br />+ Tasks and responsibilities <br />• Adherence to established Industry and professional standards <br />• Forms and reporting documents that will be required <br />• Compliance with client -mandated standards and deliverable requirements <br />+ Statements of safety procedures for fieldwork <br />Three types of established standards should be considered for each project: industry or <br />discipline standards, client -imposed standards, and our company standards. Industry <br />standards may be considered the minimum level of standards for a given project, 'These are <br />the common standards used throughout the industry or discipline and are generally based on <br />liability and protection of the public. Client standards are those unique standards required by <br />the client for the project. They may include CARD standards, drafting styles and the level of <br />confidence (sigma) required for the data. Our firm's standards are those developed our local <br />conditions or in-house operations. These standards focus on client service, communication, <br />reporting, documentation, and the use of advanced technology. <br />During the project planning and start-up phase; Coast's Survey Manager will work with the <br />technical managers and office staff to select the checking program and review forms <br />applicable to a particular project. They may add additional review forms and checking program <br />items that are unique for that project. <br />On a specific project, the survey manager takes responsibility for the implementation of a QA <br />Program for the entire project. This includes making sure that the project team has a clear <br />understanding of the latest scope of work and contract conditions, and has the available staff <br />and resources to perform quality work, The survey managers or project surveyors take <br />responsibility for the detailed standards, checking, and reviews required. <br />A major part of the assignment of tasks and responsibilities will be the management of the <br />various team members and subcontractors involved with this project. Management of these <br />elements and insuring their compliance with the work plan, standards, schedule, budget and <br />high quality results will be the major task of the survey manager. To insure quality and <br />adherence to the project standards the survey manager will: <br />1. Provide a complete project briefing prior to commencement of any work. The briefing <br />should include all staff and subcontractors assigned tasks on the project. <br />2. Provide all team members or subcontractors with a written work plan including a <br />description of tasks, milestone schedules, budget and specifications for the work Involved. <br />3. Have the subcontractors transmit weekly situation reports to the project manager via e- <br />maid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.