Laserfiche WebLink
Exhibit A — Request for Proposal — Scope of Services <br />DESCRIPTION AND SCOPE OF WORK <br />The City of Santa Ann is issuing this Request for Proposals (RFP) for Consbuction SLIN&Ying and <br />Map Cracking Services. <br />Construction Surveying Services <br />In general, the Consultant shall perform mane ment piesv-,/aaciri and construction staking for various <br />City projects or) an as -needed oasis, A California-ftensed land curievor shall be in responsible <br />charge of all survey work performed under the contract. <br />The Consultant's services shall mclude, but not !ap limited to, tile following: <br />A- Research existing County and City records for survey inanumprits within the projectarea. <br />B. Prior to any clearing. removal, or excavation efforts, perform a diiigent search for prol:*(Iry <br />line nionuments, street cenirarline monuments, and benchmarks mthin the pioject area, <br />recording their identities and precise locations in reference to nionumeriLs or witness <br />710111-InlentS that will not be diishrrbod during construction- The records of these monuments <br />and references shaR conform to Sect -ion 8771 of the BLaireSS and Professions Code of the <br />State of California. After completion of the construction, any monUfl'16nt distUrbed Or <br />removed during construction shall he reset, conforming to Section 8771. Each centerline <br />intersection shall be drawn on a single Corner record showing local be points and tie <br />distances, The Comer Records shall be drifted in Microstation (version 8 or Parher), and a <br />digital copy of each submittad to the City. <br />C. Provide construction staking for project improvements, Records of the line and grade stakes <br />(r_rat ollesitsl shall be on 'arms provided by the City, and the n6ginals -shall become the <br />property at the Chy upon completion of each survey request. The City will providdigital <br />construction plans and specifications for each project. The consultant shati furnish hard <br />copies of plans for field personnel as needed. <br />D. Set line and grods, stakes in accordance with the plans and specifications, NorN the City <br />immediately of any discrepancies of design erricirs discovered on the plans during stakrng ar <br />vJhPn verhving the line and grade of existing improvements at join points. <br />E Complete the construction staking within the tune frame specified on the Survey Request <br />Form, or (given minimurn notice) carnmence the staking no later than two working days from <br />the receptor the request, pi-OVidiRg COrdrIJOLIS service Until the iecluest is complete. <br />F. Furnjch all office support, ]Labor, materials, equipment, tools, and incidentals necessary to <br />complete the specified surveys. The costs for these items shah be included in ilii hourly ai <br />lump sung costs slid no additional coniRensatron villi be allowed therefore. <br />