Laserfiche WebLink
ro. Attend meetings with CititIR staff as rsqLlirecl <br />Map Chockincl Servs ces <br />H Information furnished by the C4 for checking will be rough] as follows: 1 set of Exhibits, title <br />reports, reference documents (rated, Parcel Map, Tract Map, etc.), traverse CIOSLJN?S, and <br />improven,pnt plans. <br />f. Review Exhibits for technical cumetiless, and conlpletencss, consis1pnvy with the City <br />guidelines and requirements, compliance with the Subdivision Map Act, and acceptance for <br />recanting. <br />J_ Review title report and eximnig easements for correct plotting and references. <br />K. Revie,,v improvement plans associated with the project to ensure the Exhibits .cirrLcfly <br />identify the limits and locatioii as shown on the impiovernent plans, <br />L Provide a set of redline check prints showing the red1kned comments, and rB(,Llirpd <br />coff actions and inforniation. <br />M, Provide a check letter covering the major required comments, and corrections and instruction <br />for fUtUn? sulbrnittals. <br />N. Provide a firripshect with items L. and M, above at the end of every review. The timesheet <br />must include, but is not limited to, project nanne, review number, dates, review hours, hourly <br />rare, and total cost, <br />Miscellaneous Services <br />0, Provide survey 99rVirPS as requested, A detailed scope of work will be outlined when, <br />specific protect is assigned to the consultant. Services chat include, but are not limited to, <br />intersection gilds, centpiline determ-inatfon, digital terrocri models (Atm), right <br />of way distsm)ination, utility profiles and exhibits. <br />P. Generate a computer draying in Nlicrostation VR format showing survey per !he attached City <br />of Santa Ana OADD Standards (Attachment B) as vafli as the sampfe SUIVey drawing on the <br />City of Santa Ana w,;b&Ae listed in item 4 bclow: <br />0. All survey needs to be, prepared to the safisfaction of the Cite',s Senior Surveyor and ineet the <br />following standards: <br />Horizontal control shall be based on the 1983 North American Daturn (RAM3), tied to a <br />Minimum of two proximate County of Orange, CCS83, Zone VI, 199 .35 Ell Adjustnvent <br />control points. Project coordinate VaILIOS shall be provided in U.S. Survey Feet. The CoLint", <br />control points shall detprm4ip the Basis of Bearing for the Project. <br />S. Vertical control shall be based on the North American Vertical Datum of 19,88 (NAIVD68)bed <br />to a 1-ninimunn of roc Proximate County of Orange banch marks. Project elevations shall be <br />provide in U.S. Survey Feet. <br />T. Horizontal alignment(s) foi the project shall be tied to the survey centerline lionurnprilf vithill <br />tile Pioject area. <br />