My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 4 - 2014
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 4 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:36:31 PM
Creation date
7/22/2014 11:42:34 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2014-101
Agency
PUBLIC WORKS
Council Approval Date
4/15/2014
Expiration Date
6/30/2016
Insurance Exp Date
9/18/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. With the coardinite viii -res, a fill location and detailed clesciiption, including <br />. point character <br />-with reference(s), shall be provided for all found and set monuments for the project. For this <br />purpose, a sketch of the control network is required, <br />COPIPS Of all SLIF-Vey field notes and rarov, data flies shall be provided along with a listing c the <br />I <br />IIIIII coordinates for all surveyed points. The digital file format for tie iisting shall be: point <br />purr r, northing, easting, elevation, description (cinnnna delineated'with no spaces, one <br />point per line). The rooidinate pnecisiori shall be orie hundredth of a foot. <br />At, any given hime the City may need to mobilize surae' crews to diftferit project sites. the <br />consultant shall have a miniMUnn of three (3) survey crews ;or mobilization. <br />X. All City CADD standards as wsi as Microstalion cininfiguration files are located at: <br />Y. httpJh"'wsanta-ina org/ps q/En gin eefinclSeMces,asp <br />11, IMPLEMENTATION <br />A. City staff shall have the right to modify, reduce, ar delete, the services as needed ay City. <br />B. The term of the contract shall be for two (2) years which shall commence on the date that <br />City Council approves the award or the, date that all required bonds and insurance have been <br />appruved by the City Attorney, whichever occurs last. <br />IlL PERFORMANCE SCHEDULE <br />A. City staff will provide' ritten request for qMtPs. The consulUnt will respond, in writing within <br />3 working days. The City can request [Ump er.1 or hourly nste qUotes. The consultant shall <br />provide hackula documentation for allexperisps upon City request, <br />B. Upon approval and within 7,working days, the Grtv shall issue the Notice, to Proceed, Survey <br />wcirk shall begin within 2 wGi king days front the receipt of the Survey Request Form. Map <br />checking work shall begin as indicated on the Notice to Proceed. <br />C. The City reserves the right to assess liquidated damages m terminate the contract. <br />D. City staff shall have the right to negotiate the to ms of lbe quote, <br />
The URL can be used to link to this page
Your browser does not support the video tag.