Laserfiche WebLink
Lead Removal: <br />The Contractor shall take all necessary precautions and follow all Occupational Safety & Health <br />Adminlstration (OSHA')s guidelines required in the handling of lead contained materials if any are <br />detected. Please refer to the Lead Hazard Evaluation Report which will be provided to the Contractor <br />prior to on -call bid, <br />Rat and /or Vermin Abatement: <br />Contractor, prior to performing demolition, is responsible for providing rat and /or vermin abatement. <br />As part of the demolition completion package, written certification will be provided to the City, stating <br />that such work was performed, and that the structures were free of infestation prior to the demolition <br />taking place. <br />Erosion Control: <br />Contractor shall prepare erosion and sediment control plan immediately after award of the contract for <br />the approval of the Engineer. The plan shall be prepared per the applicable guidelines described in <br />the latest version of the Orange County Program Construction Runoff Guidance Manual <br />(http: / /ocwatersheds.com/ documents /bmo /constructionactivities). The Contractor shall submit the <br />plans for review and shall make the necessary revisions to the plans as directed by the City. The <br />plans shall be prepared by a Civil Engineer licensed in the State of California. The City may waive the <br />requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to the City that the <br />person preparing the erosion control plan is qualified in the field of erosion control. <br />The Contractor shall keep a copy of the erosion control plan on -site for the duration of the contract <br />and shall provide all necessary control devices to implement all necessary measures as shown on the <br />plan. The erosion control plan shall remain in effect until approval to remove is granted by the City. <br />All erosion control materials shall be available on -site and stockpiled at a convenient location to <br />facilitate rapid construction of temporary devices when rain is eminent. <br />City of Santa Ana RFP 'I4-026 <br />Page 10 <br />251 -22 <br />