My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - CIP DEMO SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25I - AGMT - CIP DEMO SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:50:28 PM
Creation date
7/31/2014 2:11:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lead Removal: <br />The Contractor shall take all necessary precautions and follow all Occupational Safety & Health <br />Adminlstration (OSHA')s guidelines required in the handling of lead contained materials if any are <br />detected. Please refer to the Lead Hazard Evaluation Report which will be provided to the Contractor <br />prior to on -call bid, <br />Rat and /or Vermin Abatement: <br />Contractor, prior to performing demolition, is responsible for providing rat and /or vermin abatement. <br />As part of the demolition completion package, written certification will be provided to the City, stating <br />that such work was performed, and that the structures were free of infestation prior to the demolition <br />taking place. <br />Erosion Control: <br />Contractor shall prepare erosion and sediment control plan immediately after award of the contract for <br />the approval of the Engineer. The plan shall be prepared per the applicable guidelines described in <br />the latest version of the Orange County Program Construction Runoff Guidance Manual <br />(http: / /ocwatersheds.com/ documents /bmo /constructionactivities). The Contractor shall submit the <br />plans for review and shall make the necessary revisions to the plans as directed by the City. The <br />plans shall be prepared by a Civil Engineer licensed in the State of California. The City may waive the <br />requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to the City that the <br />person preparing the erosion control plan is qualified in the field of erosion control. <br />The Contractor shall keep a copy of the erosion control plan on -site for the duration of the contract <br />and shall provide all necessary control devices to implement all necessary measures as shown on the <br />plan. The erosion control plan shall remain in effect until approval to remove is granted by the City. <br />All erosion control materials shall be available on -site and stockpiled at a convenient location to <br />facilitate rapid construction of temporary devices when rain is eminent. <br />City of Santa Ana RFP 'I4-026 <br />Page 10 <br />251 -22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.