My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - CIP DEMO SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25I - AGMT - CIP DEMO SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:50:28 PM
Creation date
7/31/2014 2:11:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX <br />EXHIBIT B <br />ON -CALL DEMOLITION SERVICES Comparison Form <br />ON -CALL DEMOLITION SERVICES COMPARISON FORM <br />Contractor shall complete this form as described below and submit in a sealed fee envelope, This <br />comparison is based upon ON -CALL DEMOLITION SERVICES required for the sample subject <br />project site described below, This form will be used for flee comparison purposes only. <br />�Y11111x��i1�111��i����� ►]_�Yy:71��N7►F <br />One story commercial structure. The building is Reinforced Concrete Masonry Unit (CMU) <br />construction with the following approximate dimensions: <br />Finished office /retail area: 435 sf <br />Finished shop area: 1.615 sf <br />Total Building Area: 2,250 sf <br />- Total Land Area: 6,250 sf <br />Contractor is responsible for demolishing all improvements, including: 4" thick concrete slab <br />foundation and footings to a depth of 3', asphalt concrete parking lots and all surrounding <br />landscaping. Contractor is also responsible for clearing the site, grading the parcel for drainage, <br />capping all sewer lines, and compacting to 90% density. Erosion control to include importing and <br />exporting fill dirt as needed, installing straw waddles around site perimeter, topping site with 1" base <br />course to prevent wind erosion, and installing rumble plates for the duration of the demolition. <br />Please refer to Attachment 1 for site reference and photos. <br />Price provided below shall be based solely on the information provided hereon and shall be an all - <br />inclusive price and shall include all items listed and cover all items or work identified above to deliver <br />a clear site with no remaining improvements. <br />Item Description <br />Total Cost <br />Permitting * <br />11,500 <br />Engineering <br />$ <br />Site Fencing <br />$ <br />Canopy BMP's /Erosion Control Plan <br />$ <br />Asbestos /Hazardous Abatement <br />$ <br />1,000 <br />Interior Demolition <br />$ <br />Exterior Wall/Building/Foundation Demolition <br />$ <br />Sitework Demolition <br />$ <br />Vermin Abatement <br />$ <br />Total Price <br />$ <br />* Assumed Prices of Asbestos /Hazardous Abatement and Permitting Costs. There is no lead <br />removal for this sample project site. <br />Page 11 <br />251 -23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.