Laserfiche WebLink
City of Santa Ana May 27, 2014 <br />On -Call Demolition Services RFP No.; 14026 <br />J &G's assigned Project Manager will first manage the services that are required to be performed within <br />24 hours of CTO execution. If required, fencing and boarding will be installed to secure the site. All <br />necessary notices, ordinances, statues rules, laws, and regulations shall be followed in the <br />performance of the CTO. Notifications/ permits may include- city grading, city demolition, city sewer <br />capping, Orange County Health Care Agency ( OCHCA) tank closure, OCHCA water well closure, <br />OCHCA monitoring well closure, South Coast Air Quality Management District (SCAQMD) demolition, <br />SCAQMD asbestos abatement, SCAQMD VOC containing tank or soil abatement, OSHA excavation, <br />OSHA faisework, OSHA over height, and OSHA scaffolding, <br />The Project Manager will direct J &G's consultant to prepare a Notice of Intent (NOI) to comply with the <br />terms of the general permit to discharge storm water associated with construction activity, for sites that <br />are one acre or larger in size. The Project Manager will submit the NOI and permit fee to the State <br />Water Resources Control Board. When required, the Project Manager will direct J &G's consultant to <br />prepare a Construction Storm Water Pollution Prevention Plan ( SWPPP), or an erosion control plan. <br />Storm water best management practices will be implemented as needed for compliance with the <br />SWPPP /Erosion Control Plan. <br />A site specific Health & Safety Plan will be prepared for the project. The Field Superintendent will <br />conduct periodic tailgate Health & Safety meetings to cover health and safety issues with field workers. <br />J &G's consultant will periodically conduct site safety inspections Results are given to the Project <br />Manager for directing changes <br />Underground Service Alert will be contacted to have the location of utilities marked.. The Project <br />Manager shall contact utility companies to coordinate any required utility terminations. Where required, <br />sewer capping will occur at the beginning of work, The Field Superintendent will be on site at the time <br />the agency is scheduled to inspect the utility termination. <br />Care shall be taken to perform the services so as not to endanger the safety of any person or property. <br />At the start of the CTO, the Field Superintendent will visually survey existing improvements and utilities <br />near the work site, in order to protect them from damage Field Superintendent will also visually survey <br />the site for potential materials containing regulated /hazardous wastes. The Project Manager will contact <br />CSA of any findings <br />As directed by the CSA, the Project Manger will arrange for J &G's consultant to perform an asbestos <br />and lead -based paint survey and an abatement plan for the asbestos and lead containing materials <br />removal and disposal When an asbestos and lead -based paint survey has been previously prepared, <br />the Project Manager will arrange for J &G's subcontractor to prepare an abatement plan. The abatement <br />plan will be submitted to the SCAQMD for their approval. The Project Manger shall confirm that all <br />J &G Industries <br />251 -60 <br />Page 11 <br />