Laserfiche WebLink
City of Santa Ana May 27, 2014 <br />On -Call Demolition Services RFP No,; 14.026 <br />required licenses, permits and certifications have been acquired for implementing the abatement plan <br />The Project Manager will submit the SCAQMD approved abatement plan for CSA approval to proceed <br />with its implementation, Upon CSA's approval, J &G's abatement subcontractor will Implement the <br />abatement plan. Field Superintendent will verify waste is properly manifested for disposal at proper <br />facility, <br />Upon completion of abatement plan Implementation, the Field Superintendent will conduct a pre - <br />demolition survey to identify: that the asbestos, lead, regulated and hazardous wastes have been <br />removed as per their abatement plans; verify monitoring records; verify proper manifesting of waste <br />disposal; visually verify no other hazardous materials are left in demolition area; as required, verify site <br />is secured by appropriate fencing; verify that appropriate protection devices are in place, such as <br />pedestrian protection canopy; verify appropriate signing displayed (i,e, no trespassing, keep out <br />demolition in progress, danger, etc ); verify all utilities have been terminated; and erosion control <br />measures are in place, as needed and required, The Field Superintendent will use a checklist to <br />complete the pre- demolition survey. The Field Superintendent will confirm with the Project Manger that <br />the demolition area is ready for demolition, Structures ready for demolished will be clearly marked <br />"CLEAR FOR DEMO J &G." <br />Field Superintendent will direct crews in: structure demolition; improvements demolition; salvaging <br />procedures; solid waste clearing and disposal Where practical, concrete, asphalt, steel, non - ferrous <br />metals, and wood will be segregated and sent off -site for recycling, The site will be backfilled, graded <br />and a minimum of 1" base material will be placed over entire lot with sand bags /wattles at perimeter, <br />Field Superintendent will review fieldwork daily for compliance with CTO specifications and record <br />findings in a quality control log <br />Field personnel are trained to stop work upon the discovery of suspect asbestos, regulated, or <br />hazardous waste. The Field Superintendent will contact the Project Manager, who in turn will contact <br />CSA. The Field Superintendent shall leave the work site in a clean and neat condition, upon completion <br />of the CTO, The Project Manager will notify those agencies required for final inspections and sign offs <br />The Project Manager will track the CTO schedule and budget by using project management software. <br />Schedule and budget updates will be provided to the CSA as required. Project Manager will notify CSA <br />to have all work inspected within 24 hours of CTO work completion. The Project Manager will prepare <br />all required paperwork for final closure package and billing for the project. <br />J &G Industries <br />251 -61 <br />Page 12 <br />