My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT - SEWER MASTER PLAN UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25K - AGMT - SEWER MASTER PLAN UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:50:59 PM
Creation date
7/31/2014 2:25:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Develop Sewer System Model <br />1. The objective of this task is to prepare a dynamic hydraulic model of the City's <br />existing sewer system using the City's GIS database, and Bentley's SewerGEMS, <br />commercially available hydraulic modeling software that is compatible with ESRI <br />GIS data. <br />2. The City has a current AreGIS database, including a comprehensive sewer map in <br />GIS format showing all sewer mains and manholes, which shall be used as the basis <br />for the preparation of the hydraulic model. <br />3. The survey data included in the 2003 Sewer Master Plan and the follow -up survey <br />data should be used within the model. <br />4. The consultant shall recommend the best practices and approach to creating the <br />hydraulic model from the City's GIS and existing data with special attention to <br />populating pipe invert elevations using the above survey data assuring that all pipes <br />are on the same datum. <br />The hydraulic model is expected to be comprehensive and shall include all major <br />sewer mains appropriate for hydraulic modeling. The consultant shall, in coordination <br />with the City staff, identify the major sewers to be initially hydraulically modeled and <br />studied. As a minimum, all of the sewer mains modeled in the 2003 Sewer Master <br />Plan shall be included in the update. The consultant shall, in coordination with City <br />staff, identify a plan and needs assessment for further hydraulic modeling of non - <br />major City sewers for capacity assurance. All OCSD trunks originating within the <br />City shall be included in the model. The drainage basins shall be consistent with the <br />2003 Sewer Master Plan and shall correlate to the corresponding OCSD trunk sewer. <br />6. The two existing lift stations will not need to be analyzed by the update. The lift <br />stations shall be included in the model only to transport the flows downstream. <br />7. A number of non - hydraulic attributes shall be included in the model such pipe <br />material and year of construction. <br />8. The model shall incorporate all land use data including the City's general and specific <br />plans and population /employment census data and projections. <br />C. Develop Wastewater Plows <br />1. Update the flows based on population and employment data and projections. Evaluate <br />impacts of past and current water conservation measures, water shortage, water <br />reduction measures implemented by the City. <br />2. Obtain flow monitoring data from long -term meters installed by OCSD that apply to <br />the City's sewer system. Review and evaluate previous flow monitoring data included <br />25K -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.