My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT - SEWER MASTER PLAN UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25K - AGMT - SEWER MASTER PLAN UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:50:59 PM
Creation date
7/31/2014 2:25:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the 2003 Sewer Master Plan. <br />3. Update the major wastewater dischargers, including the industrial dischargers, and <br />cross -check this list with the City's largest water users. Update all point sources and <br />their estimated average daily process flows. <br />4. Review the Infiltration/Inflow Study included within the 2003 Sewer Master Plan. <br />The update shall recommend the appropriate inflow and infiltration rates in the <br />analysis. <br />5. Based on the above information, recommend the design flow criteria for both dry <br />weather and wet weather flow parameters to be used in determining the existing flow <br />conditions. Be sure to evaluate any need to reduce the previous design flow criteria <br />due to water conservation measures since the 2003 Sewer Master Plan. <br />6. Review the hydraulic deficient areas of the City's sewer system contained in the 2003 <br />Sewer Master Plan. Consultant shall propose and execute a plan to measure and <br />collect sufficient dry and wet weather wastewater flows to utilize in calibrating the <br />sewer model. The plan shall include the proposed locations of the temporary flow <br />monitoring stations and the procedures for monitoring. <br />For the proposal, assume five (5) flow monitoring sites will be required. A minimum <br />of two (2) week dry weather flow monitoring will be required, During the rainy <br />season, the same sites shall be monitored for a minimum of two (2) weeks. The <br />consultant shall provide the required traffic control plans and traffic control during <br />the flow monitoring, including the set -up and removal of the equipment from the <br />manholes. <br />8. In addition, to confirm the anticipated flows, the consultant shall field inspect at peak <br />flow hours those manholes in known or suspected problem areas to confirm the depth <br />of flow (or surcharge) within the manhole. For this proposal, include field inspection <br />often (10) manholes will be required. The inspection of each manhole shall be <br />performed during peak dry weather flow and during peak wet weather flow (during a <br />rain storm). The consultant shall provide the required traffic control during the field <br />inspection. <br />D. Sewer System Capacity Analysis <br />1. Recommend the capacity analysis criteria to be used in the update. <br />2. Include within the analysis, the impacts of any backwater from OCSD's trunk sewers. <br />This information shall be obtained from OCSD and their most recent modeling of the <br />trunks. <br />3. The capacity analysis shall be performed for the current conditions and for conditions <br />25K -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.