My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT - TRAFFIC SIGNAL AND STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25L - AGMT - TRAFFIC SIGNAL AND STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:51:42 PM
Creation date
7/31/2014 2:54:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clean the solar panels in accordance to the manufacturer's recommendation. <br />This Is required to be done once every 6 months. <br />Contractor shall clean Video Detection camera lens once a year <br />• Maintenance Record <br />The Contractor shall maintain a record log in each controller cabinet showing <br />the date and time of any service. It shall consist of: <br />a. Routine Maintenance <br />b. Extraordinary Maintenance <br />All records shall be legibly written or printed. These record logs shall become <br />property of the City. <br />6. Extraordinary Maintenance <br />Extraordinary maintenance includes work tasks to install new, replace or repair defective <br />or obsolete equipment and perform modification work not directly covered by routine <br />maintenance. Work shall be performed with prior City approval unless emergency or <br />public safety conditions require immediate response. <br />7. Emergency Service <br />The Contractor shall provide emergency service to the City twenty -four hours a day, <br />seven days a week upon City's request. Unless stated by the City at the time of request, <br />the contractor will need to ascertain whether request is of an emergency nature requiring <br />immediate response. <br />Failure or malfunction of the traffic signal or interruption of normal operation as to create <br />confusion or public hazard is considered emergency nature. <br />(a) The contractor shall provide qualified personnel at the location within 30 minutes of <br />receiving emergency request. <br />(b) The Contractor shall immediately troubleshoot and restore the traffic signal to normal <br />operations. If that is not possible due to the extent of the damage, sufficient <br />temporary repairs shall be made to enable the intersection to operate safely. In no <br />event shall the traffic signal be left overnight in dark mode (black out). <br />(c) For intersections with power outages, The Contractor shall use the following <br />procedure: <br />(1) Setup temporary stop signs at all approach upon arrival at the site. <br />(ii) Turn off the traffic signal controller and place cabinet control to flashing <br />operation. <br />(iii) Once the power is restored, remove all stop signs and return the traffic signal to <br />normal operation. <br />8. Compensation For Routine And Extraordinay Maintenance <br />(a) Routine Maintenance: <br />Compensation for routine maintenance of traffic signal system shall be per <br />contracted unit price. Said compensation shall include all labor, material, equipment <br />and overhead /profits. <br />(b) Extraordinary Maintenance: <br />25L -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.