My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - FIXED GUIDEWAY PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
55C - RESO - FIXED GUIDEWAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2014 8:54:04 AM
Creation date
8/4/2014 8:51:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This EA /DEIR was prepared to meet the requirements of NEPA and CEQA. As required by <br />these laws, the environmental review process must be completed before the proposed project <br />can be approved by the City of Santa Ana (acting as the lead agency for Santa Ana and <br />Garden Grove) and the FTA. Meaningful public engagement was an important component of <br />the SA -GG Fixed Guideway Project from the start. Well before any key decisions were made, <br />the City of Santa Ana initiated a public scoping process to help define the appropriate range <br />of issues to be addressed in the EA /DEIR. Four scoping meetings were conducted for the <br />general public between June 8 and June 12, 2010. Two of these meetings were scheduled <br />in the evening, one meeting was scheduled in the morning and one meeting was scheduled <br />on a Saturday afternoon, providing those community members who could not attend any of <br />the weekday evening meetings with an opportunity to participate. Public comment <br />opportunities were made available at each meeting. It should also be noted that articles and <br />advertisements were published in a number of local newspapers, including several non - English <br />publications. All information materials were presented in English as well as Spanish. <br />The alternatives identified for evaluation in this EA /DEIR were based on public comments <br />as well as technical analyses, as detailed in the AA Report (under separate cover and <br />available by request or on the City's website at http://www.ci.santa - <br />ana.ca.us/transitvision). Following receipt of public comments on the EA /DEIR, the Santa <br />Ana and Garden Grove City Councils will select an LPA for the Fixed Guideway Project. <br />Their decision will be based on a combination of environmental impacts, community input, <br />cost, ridership and economic development considerations brought to light through the <br />EA /DEIR, AA, and public review process. Subsequent to the City actions, the LPA will be <br />presented to the OCTA Board of Directors. If necessary to address comments received <br />during the environmental public review, additional engineering may be performed to refine <br />the conceptual design of the LPA prior to presentation to the City Councils. If a hybrid <br />alternative which results in changes outside the envelope of environmental effect is <br />selected, then an environmental re- evaluation may be needed. <br />2AILTEMMEML 1 <br />Table 3 -1 summarizes the potential adverse effects associated with the implementation of <br />Streetcar Alternatives 1 and 2. No impacts would occur from the implementation of the <br />TSM Alternative. The information presented in Table 4 -1 is a summary of the analysis <br />contained in the EA /DEIR. <br />Adverse effects associated with hazardous materials, operational noise (moderate), safety, <br />and construction air quality are anticipated to occur prior to incorporation of mitigation <br />measures (CEQA only). Each of these adverse effects would result from implementation of <br />Streetcar Alternatives 1 and 2. Mitigation measures would eliminate the adverse effects <br />associated with hazardous materials and safety. Moderate effects associated with <br />LPA Decision Report <br />July 2D 14 <br />55C -50 <br />3.1 I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.