My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - FIXED GUIDEWAY PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
55C - RESO - FIXED GUIDEWAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2014 8:54:04 AM
Creation date
8/4/2014 8:51:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operational noise and identified in the EA /DEIR would remain after the implementation of <br />mitigation, however these effects would not be considered adverse. In addition, significant <br />construction air quality impacts under CEQA would remain after the implementation of <br />Mitigation; however, it should be noted that construction - related air quality impacts would <br />be temporary and not adverse under NEPA after the implementation of mitigation. No <br />adverse effects were identified for the TSM Alternative. <br />In addition to mitigation measures, design features and best management practices have <br />been incorporated into the proposed project. These include a Traffic Management Plan, a <br />Noise and Vibration Control Plan, and a number of features to manage water quality. Refer <br />to Chapter 3.0 of the EA /DEIR for detailed discussions of these features and best <br />management practices. <br />LPA Decision Report <br />July 2014 <br />55C -51 <br />3 2 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.