My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - FIXED GUIDEWAY PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
55C - RESO - FIXED GUIDEWAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2014 8:54:04 AM
Creation date
8/4/2014 8:51:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Streetcar Alternative 1 is estimated to have the highest ridership and serve the greatest <br />number of transit depended households. <br />Streetcar Alternative 1 costs less than Streetcar Alternative 2 to construct and operate. <br />The Streetcar Alternative 1 alignment has the most transit supportive existing land use and <br />development patterns to support a high capacity transit system. <br />With the provisions of the Transit Zoning Code considerable additional development <br />opportunity and potential exists along the Streetcar 1 alignment compared to Streetcar <br />Alternative 2 which has heavily institutional /government uses and parking structures along <br />its Downtown /Civic Center alignment. <br />Streetcar Alternative 1 ranked second in Constructability /Ease of Construction. This is due <br />in part to improvements already completed by the City of Santa Ana along Santa Ana <br />Boulevard and 4th Street that have addressed some of the potential utility relocation <br />challenges that exist along 51h Street. <br />4th Street Parking Scenario A: Replace Parking along South Side with Parallel Parking and <br />Widen Southern Sidewalk to 20 Feet is recommended. <br />• Eliminates the fewest on- street parking spaces along 4th Street <br />• Adequate replacement parking is available at nearby parking structures on 3 r 4th <br />and 5t° Street. <br />• Replacing the diagonal parking with parallel parking provides traffic operations and <br />safety benefits to the streetcar and automobiles traveling eastbound on 4th Street <br />by eliminating vehicles backing into the traffic stream. <br />• Parallel parking allows for widening of the southern sidewalks by 8 feet which will <br />enhance the pedestrian experience and provide for pedestrian- oriented uses and <br />activities along the south side of 4th Street. <br />Coordination and communication between the cities of Santa Ana and Garden Grove, <br />OCTA and affected business and property owners will need to be ongoing as the project <br />progresses through design, construction and operations. <br />Of the two operations and maintenance facility sites, Site B located along 5th Street west <br />of Raitt Street is the Preferred Site for the following reasons: <br />• Its size, rectangular shape and proximity to the PE ROW make it more efficient for <br />both development and operations. <br />• It is estimated to be less expensive than Site A (near SARTC). <br />• Its location in the western half of the corridor provides greater flexibility to serve <br />future extensions or connections through Garden Grove to Anaheim. <br />LPA Derision Report <br />July 2014 <br />55C -78 <br />5.71 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.