My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING 1 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
CALIFORNIA PROFESSIONAL ENGINEERING 1 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2016 3:46:26 PM
Creation date
8/12/2014 10:46:06 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING
Contract #
A-2014-136
Agency
PUBLIC WORKS
Council Approval Date
6/17/2014
Expiration Date
3/31/2015
Insurance Exp Date
2/28/2016
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be included in the lump sum costs proposed. The Proposer may need to excavate to access and <br />disconnect the existing conduit sweeps at the pole foundations to properly pull the new wire. All costs <br />for excavation, including hardscape replacement and conduit disconnect/reconnect shall be included <br />in the lump sum price. <br />Scope of work includes the following: <br />Install new service pedestals per specifications. <br />• Remove existing cable from conduit. <br />• Intercept existing conduit and install new conduit and pull boxes to connect to new service <br />points. <br />• Re -wire system using existing conduit. <br />• Replace any deteriorated conduit only if it is impossible to pull the new wire through. <br />• Remove and salvage existing fixtures. <br />• Rewire poles and install new fuses and fixtures, etc. per City Standard #1126 -F. <br />Material List <br />• Fixtures: Powerlux PLEDMR /DV/6/9/4000/740/120- 277/SA <br />• Wire: THW red, black, green <br />Conduit: 2" Schedule 80 PVC <br />• Fuses: 240V 10A with holder per City Standard #1126 -F two (2) per pole <br />Service Pedestals: Milbank MILCP3B11115A22SP33 120/240V w/ GFI duplex receptacles; <br />base MILCP16PDMNTCALT <br />PART II SPECIAL PROVISIONS <br />I. EXCAVATING AND BACKFILLING <br />Excavating and backfilling shall conform to Section 86.2.01, "Excavating and Backfilling" of the <br />California State Specifications (CSS) and these Special Provisions. <br />The following paragraph shall be added to Section 86 -2.01: <br />All excavated material in roadway shall be removed from the site and backfilled with compacted <br />crushed aggregate base material topped with temporary asphalt concrete on the same working day <br />as removed. A temporary alternative to backfilling, with permission of the Agency, shall be the <br />placement of steel plates with temporary asphalt concrete ramping at edges of the steel plates. Such <br />plating shall not be allowed for more than five (5) working days, after which backfill shall be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.