My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING 1 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
CALIFORNIA PROFESSIONAL ENGINEERING 1 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2016 3:46:26 PM
Creation date
8/12/2014 10:46:06 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING
Contract #
A-2014-136
Agency
PUBLIC WORKS
Council Approval Date
6/17/2014
Expiration Date
3/31/2015
Insurance Exp Date
2/28/2016
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />PART I — SCOPE OF WORK <br />The North Park Circuit is designated on the attached map. The North Park Circuit has approximately <br />22,000 LF of wire and 101 poles. Approximately 18 of the poles are double kings with 2 fixtures each. <br />The North Residential Circuit is designated on the attached map. The North Residential Circuit has <br />approximately 30,000 LF of wire and 112 poles. <br />The conduit locations shown on the maps are approximate. It is the Proposer's responsibility to <br />ascertain the quantities of fixtures, wire, pullboxes etc. All proposed locations shall be shown on the <br />final plans designed by the Proposer and approved by the Agency. <br />The Contractor shall provide at its own risk and cost all labor, materials, tools, equipment, and traffic <br />control per the Work Area Traffic Control Handbook ( "WATCH "). <br />This Request for Proposal calls for the removal and replacement of the existing street light cable in <br />the Floral Park Neighborhood which is bordered by Broadway and Flower Street, between 17th Street <br />and the Santiago Creek. <br />This project will require replacing all the cable in the entire system with three new #8 THW wires. The <br />existing poles are required to be rewired with new #12 THW wire, the existing fixtures removed and <br />salvaged, replaced with new PowerLux fixtures and globes. The new fixtures may need minor <br />modifications to fit existing pole configurations. Costs for modification shall be included in the lump <br />sum proposal amount. <br />New service pedestals will be furnished and installed by the Proposer. Proposer shall determine the <br />number of new service points necessary to adequately provide power for the system, using the <br />minimum number of service points possible and shall coordinate with SCE to determine the new <br />service points. All SCE engineering costs will be paid by the City. The SCE planner for this project is <br />Isaac Dominguez 714- 285 -4339 <br />Proposer will locate and intercept existing conduit adjacent to service pedestal and install conduits <br />and pull box adjacent to pedestal. All costs for conduit work, including hardscape replacement, to <br />connect to service pedestal shall be included in lump sum costs. New wire shall be placed into and <br />connected properly in service pedestal. All work, equipment, labor and materials necessary to provide <br />complete functioning system shall be included in the Proposal pricing. Existing globes shall be <br />cleaned, salvaged and delivered to the City yard. <br />The existing streetlight systems were installed in the early 1920's. The exact condition and location <br />of the underground conduit is unknown although the existing cable was installed 5 years ago. The <br />City expects the existing cable to be used to pull in the new wire. Pre - lubrication of the conduits may <br />be necessary. The City does not anticipate that much of the existing conduit will need to be repaired. <br />Similar projects in the area have encountered less than 15% of conduit needing repair. Proposer shall <br />include 15% conduit repair in the proposal. Costs for conduit repair including materials and labor will <br />
The URL can be used to link to this page
Your browser does not support the video tag.