My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEHMAN CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
LEHMAN CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:05:30 PM
Creation date
9/3/2014 8:51:18 AM
Metadata
Fields
Template:
Contracts
Company Name
Lehman Construction, Inc.
Contract #
13-2636
Agency
Public Works
Council Approval Date
7/1/2014
Expiration Date
1/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 13-2636 <br />Request for Approval of Change Order No. 1 <br />November 18, 2014 <br />Page 2 of 3 <br />3. Santa Ana Zoo's staff requested the building to be shifted 6 -feet from the proposed alignment. <br />As a result, the proposed irrigation and site plans were modified. Consequently, staff took this <br />opportunity and requested the following improvements: <br />a. Contractor was directed to furnish and install a 10 foot by 12 foot holding area adjacent <br />to the west side of the holding building just behind Habitat Area 1. Also, contractor <br />was requested to construct a bamboo fence with gates to enclose the rear of the <br />building. (PCO No. 5) <br />Agreed Cost = $19,792.62 <br />b. Contractor was directed to remove two existing distressed orchid trees located on the <br />north section of the exhibit and utilize these as the deadfall trees for Habitat Area #1 <br />and #2. (PCO No. 6) <br />Agreed Cost = $1,335.03 4P; <br />E <br />c. Contractor was requested to add an exterior GFI outlet to supplement the decomposed'' <br />granite Group Activity Area. (PCO No. 11) <br />Agreed Cost = $769.05 �( , <br />CONTRACT COST SUMMARY <br />Amount Total % of <br />Amount Contract <br />Original Contract Total $397,419 <br />Previous Change Orders $-0- Increase 0.00% <br />Change Order #1 $26,141.60 Increase 6.58% _ <br />Total Change Orders to Date $26,141.60 Increase 6.58% <br />Adjusted Contract Total $423,560.60 <br />SCHEDULEIMPACT <br />Increase contract time by 7 working days for delays associated with this change <br />order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.