My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:07:07 PM
Creation date
9/8/2014 3:54:35 PM
Metadata
Fields
Template:
Contracts
Company Name
NORTHSTAR DEMOLITION AND REMEDIATION, LP
Contract #
A-2014-184
Agency
PUBLIC WORKS
Council Approval Date
8/5/2014
Expiration Date
8/4/2017
Insurance Exp Date
7/1/2018
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETED PROJECT REFERENCES <br />(Abatement and Demolition) <br />Name, Address and Telephone <br />Amount of Contract Start Complete <br />Scope of Work <br />of Owner of Work or Prime Contractor <br />(to closest thousand dollars) Date Date <br />Clear Blue Environmental <br />$430,000 3/12 9/12 <br />Draining/cleaning of approximately gallons <br />3840 E. Miraloma <br />of fuel oil and demolition of the gallon above <br />Anaheim, CA 92806 <br />ground fuel oil tank from the Scattergood <br />Michael Conching, (310) 864-2503 <br />Generating Station including the removal of <br />mchonching@clearblueenv.com <br />approixmately 3,000 linear feet of associated <br />underground piping. Removal of <br />approximatley CY of contaminated soil. <br />Moorefield Construction <br />$346,150 3/12 6/12 <br />Removal of asbestos containing materials <br />600 N. Tustin Avenue, Suite 210 <br />and interior demoloition of Former K -Mart <br />Santa Ana, CA 92705 <br />Building to include 91,000 sf of roofing, <br />Kevin Moore, (714) 972-0700 <br />80,000 sf of ceiling tile, 8,500 sf of wood <br />kmoore@moorefieldconstruction.com <br />mezzanine, 15,000 sf of interior stud walls <br />and 20,000 sf of block walls. Removal of <br />appprox 150,000 sf of asphalt parking lot and <br />39 trees and associated landscaping was <br />removed. from the site in Torrance. <br />Suffolk -Roel <br />$872,744 11/10 2/12 <br />Abatement and demolition of 7 buildings on <br />1615 Murray Canyon Road, #1000 <br />an occupied county facility. Abatement <br />San Diego, CA 92108 <br />included the removal and disposal of <br />Jason Albrecht, (619) 906-2908 <br />asbestos, lead and universal wastes, cleaning <br />jalbrecht@suffolkroel.com <br />and disposal of one AST and <br />decontamination of process equipment. <br />Demolition included the removal and <br />recycling/disposal of 160,000 square feet of <br />buildings and 290,000 square feet of <br />surrounding site improvements. Structures <br />consisted of six single level structures and <br />one three level structure. Work was <br />completed in phases to allow phased <br />construction and continued access to the <br />facility. <br />4 <br />NCM Demolition and Remediation, LP G:1Administration\Sharon\Demo Ref Master with #s.xls 5/27/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.