Laserfiche WebLink
COMPLETED PROJECT REFERENCES <br />(Abatement and Demolition) <br />Name, Address and Telephone Amount of Contract Start Complete Scope of Work <br />of Owner of Work or Prime Contractor (to closest thousand dollars) Date Date <br />Moorefield Construction <br />600 N. Tustin Avenuye, Suite 210 <br />Tustin, CA 92705 <br />Hal Moorefield, (714) 972-0700 <br />South Orange County <br />Community College District <br />28000 Marguerite Parkway <br />Mission Viejo, CA 92692 <br />Nader Shah, (949) 887-2401 <br />nshah@hudsonppi.com <br />University of California, Riverside <br />c/o Barnhart Balfour Beatty Construction <br />10760 Thornmint Road <br />San Diego, CA <br />Mark Chappell, (858) 228-7962 <br />mchappell@balfourbeattyus.com <br />DTE Energy Services <br />414 S. Main Street, Suite 600 <br />Ann Arbor, MI 48104 <br />Joseph Wottreng, (734-302-8230 <br />wottrengj@dteenergy.com <br />$544,080 11/11 12/11 Abatement and demolition of existing <br />shopping center consisting of 20,000 sf of <br />buildings, slabs, aphalt parking lot, curbs, <br />gutters, retaining walls, sidewalks, light pole <br />bases and canopies. Abatement and interior <br />demolition of structures scheduled to remain. <br />$550,000 7/11 9/11 Asbestos abatement and demolition of 15 <br />exisitng buildings totaling 80,000 sf. All <br />concrete foundations to remain.ATEP Site <br />Utility Severance, Tustin <br />$449,800 6/11 9/11 Removal of approx. 33,000 sf of asbestos <br />containing materials and universal wastes in <br />conjunction with the complete interior <br />demolition. Removal of 18 windows were <br />removed and with scaffolding shrink wrapped <br />for protection. Removal of underground <br />transite pipe and demolition of ancillary <br />building on site. Work was performed during <br />school hours on an active campus. Health <br />Sciences Teaching Center, Riverside <br />$656,450 5/22 8/11 Demolition of two coal-fired boilers and <br />superstructures, bag houses, silos, control <br />rooms, pulverizers and ancillary support <br />features while protecting an existing pipe rack <br />within the work area. Aproximately 5,000 <br />tons of ferrous and non-ferrous materials <br />were recycled. DTE Facility, Stockton, CA <br />5 <br />NCM Demolition and Remediation, LP G:\Administration\Sharon\Dema Ref Master with #s.xls 5/27/2014 <br />