My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. 6 - 2014
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. 6 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 10:32:01 AM
Creation date
9/8/2014 4:51:22 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2014-129
Agency
PUBLIC WORKS
Council Approval Date
6/3/2014
Expiration Date
6/30/2015
Insurance Exp Date
10/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, PWA I Agreement Exhibit A <br />RFP — ON -CALL ENGINEERING DESIGN SERVICES FOR WATER AND SEWER MAIN <br />IMPROVEMENTS <br />Cover Letter: A letter signed by a principal or authorized representative who <br />can make legally binding commitments for the entity. The letter should <br />include the complete legal company name (as it should appear in the <br />contract), company address, contact person, telephone number and email <br />address. It shall identify all materials and enclosures being forwarded in <br />response to this solicitation. This letter is not included in the page limit. <br />2. Firm and Personnel Experience: A profile of the firm's experience, including <br />the names and experience of personnel and sub - consultants (if applicable) <br />who will be providing services. At a minimum, this should include the project <br />manager /principal agent (PM), associates in charge when the PM is <br />unavailable, key personnel, and an organization chart identifying only those <br />who will perform work for the proposed project and the percentage of each <br />individual's time devoted to this project. Sub - consultants shall be identified if <br />any are anticipated for projects under contract. Changes in sub - consultants <br />shall be subject to review and approval of the City prior to execution of any <br />task orders under this agreement. Emphasis of experience should be placed <br />on design and construction of: water distribution pipelines, water transmission <br />pipelines, sanitary sewer pipelines, water pump stations, reservoir or storage <br />tank design, repair and rehabilitation practices, construction management <br />and cost estimation practices. <br />Restrict all project experience listings and descriptions to the team members <br />that are a part of this proposal team. In addition, identify which of the team <br />members shall be present for the firm interview, if invited. <br />3. Project Approach: A description of the firm's general approach to completing <br />projects under this contract, identifying major issues and recommendations to <br />accomplish the potential tasks. Proposers shall illustrate the manner in which <br />its team members have the capabilities and experience to fulfill the Scope of <br />Services and proposed project approach. <br />4. Project Management: Provide a description of the firm's project management <br />approach, tools, communication ideas as well as quality assurance and <br />quality control procedures as they apply to domestic water and sanitary <br />sewer design projects. <br />5. Sample Project Plans: Provide a "to scale" true half size set (12" x 18 ") of <br />plans to demonstrate the firm's plan quality. The sample project plans shall <br />be of a past approved project that is similar in nature to the sample project <br />described in Exhibit "A ". <br />e EXHIBIT C —PROPOSERS STATEMENT AND PROPOSAL FEE SCHEDULE <br />A fee envelope including proposer's cost proposal shall be submitted <br />concurrently but under separate cover with the technical proposal. Costs <br />should be indicated by the respective tasks described in Section XVI of this <br />document. A total not -to- exceed cost for the entire project shall be included. <br />No fee envelopes shall be opened by City until the final ranking of proposals <br />has been completed. <br />Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.