My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. 6 - 2014
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. 6 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 10:32:01 AM
Creation date
9/8/2014 4:51:22 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2014-129
Agency
PUBLIC WORKS
Council Approval Date
6/3/2014
Expiration Date
6/30/2015
Insurance Exp Date
10/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-\ Mailing \Propo5u[S \WTM \rY2olh\ WT042_9A-OnCnlisngrg -1G- <br />TETRA TECH <br />pipe. All permits will be procured to <br />C. Leighton will complete laboratory testing <br />perform the potholing. All potholes will <br />and perform geotechnical analysis of the <br />backfilled using native soil and capped <br />collected data. <br />with permanent cold patch. If duct banks <br />D. Leighton will prepare a geotechnical report <br />are potholed, the top and bottom of the <br />presenting the findings and <br />duct bank will be field verified <br />recommendations, including groundwater <br />6. Survey and Right- of-Way <br />conditions, ease of excavation, temporary <br />A. <br />Provide survey control using County GPS <br />shoring design, and pipe beddnng <br />recommendations. <br />points. <br />B. <br />Provide field survey profile over the <br />9. Alignment Selection <br />proposed sewer pipeline at 100 -foot <br />A. Tetra Tech will prepare preliminary <br />intervals. This is a similar approach to <br />drawings (30% milestone) as required to <br />what we used for the Westminster Avenue <br />establish agreement on scope, alignment, <br />Sewer Improvement Project. <br />parameters, maintenance concerns, <br />C. <br />Field locate and dip existing sewer <br />constructability, traffic impacts, and <br />manholes, connection points and storm <br />general disruption to the area. We will <br />drain crossings along the proposed <br />submit the preliminary design to the City <br />alignment for all pipelines. <br />of Santa Ana staff for review and approval. <br />The basis of design technical memorandum <br />D. <br />Tetra Tech will prepare the base maps <br />will address the following subjects: <br />using the above survey information, street <br />1) Evaluation of replacement in same <br />improvement plans (the latest, most recent <br />alignment verses parallel alignment <br />improvement plans), and supplemented <br />2) Water and sewer main alignment, <br />with Google aerial map. Tetra Tech will <br />including evaluation of the impact t <br />act to <br />plot utilities on the base maps based on <br />adjacent businesses, residences and <br />information obtained from the utility <br />traffic <br />information as well as from USA markings <br />2) Manhole locations and connection to <br />in the field. Tetra Tech will perform all <br />existing manholes <br />necessary research to obtain the necessary <br />3) Maintaining existing service <br />right- of-way information. <br />connections <br />8. Geotechnical Investigation <br />A) Hydraulics based on slopes <br />A. <br />Leighton Consulting, Inc. will perform the <br />5) Method of construction, especially at <br />geotechnical investigation. The <br />the major street crossings <br />geotechnical exploration will provide the <br />6) Traffic control concepts <br />design team and Contractor with the <br />7) Construction schedule and phasing <br />expected subsurface and groundwater <br />and construction cost estimate <br />conditions at the project site that will assist <br />8) Conflicts with other utilities <br />in design and construction of the proposed <br />9) Potholing recommendations <br />10) Abandonment of existing water and <br />improvements. <br />sewers (if select parallel alignment) <br />B. <br />Leighton will perform subsurface <br />11) Areas where construction work is <br />exploration consisting of drilling, logging <br />limited or controlled <br />and sampling of three (3) hollow -stem <br />12) Permit requirements <br />auger borings to a depth of 15 feet below <br />11 CEQA Documentation <br />the existing grade. The borings will be <br />spaced along the length of the project. The <br />A. Tetra Tech will prepare documentation <br />borings will be backfilled with soil cuttings <br />required to fulfill the California <br />and patched with cold -mix asphalt. Traffic <br />Environmental Quality Act (CEQA) <br />control will be provided, as necessary. <br />requirements. We have assumed a <br />Negative Declaration will be required for <br />M-\ Mailing \Propo5u[S \WTM \rY2olh\ WT042_9A-OnCnlisngrg -1G- <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.