Laserfiche WebLink
0q GnEden state <br />ma e C ynxv. <br />Client Reference; <br />Mr. Sun!] Pillal, P.E. <br />Engineering Design Manager <br />Golden State Water Company <br />714/535 -7711 x230 <br />sunny swater.com <br />Golden State Water Company- On -Call Services <br />RBF has provided as- needed engineering and supporting services. <br />to Golden State Water Company (GSWC) for more than 20 years. <br />- <br />Projects have Included upgrade and replacement of existing <br />- <br />facilities through Its service areas. The following are selected <br />by <br />- <br />recent projects completed RBF's Project Manager, Mr. Johnt.`'�r.: <br />Nagle, and his team members, <br />Anaheim and Placentia - Orangethorpe Avenue Transmission <br />Main and Concerto .Booster Pump Station. improvements. GSWC required that a <br />transmission main be constructed to inter- connect Its Placentia and Yorba Linda <br />service areas. This was a "fast- track" project for GSWC because it Is a primary <br />water supply to the Yorba Linda service area, Concerto Well No. 2 was to be <br />removed from service due to water quality issues, and the pipeline needed to be <br />operational prior to the well shut down. RBF provided engineering design and <br />survey services for and construction of approximately 6,500 LF of 16 -inch DIP <br />pipeline, in the cities of Placentia and Anaheim. This pipeline provides a connection between GSWC`s Placentia and <br />Yorba Linda Service Areas, and includes three pressure regulating.. stations. The scope of services included <br />extensive utility research, topographic survey and right -of -way verification, preparation of PS &E's, and traffic <br />control plans. The project also required coordination with the Orange County Flood. Control District for crossing of <br />the Atwood Channel, and coordination with Orange County Transportation Agency for a future grade separation <br />project at Lakeview Avenue. <br />Norwalk System. This work included design of water distribution pipeline replacement projects in the Norwalk <br />System. These pipeline projects were necessary to address leaks, hydraulic deficiencies, inaccessibility and <br />condition of the existing pipelines, The project included the installation of 1,300 LF of 12 -finch DIP and 10,000 LF of <br />8 -inch DIP, as well as the relocation of over 275 domestic water services. The project . was divided into two phases, <br />and the Phase 1 design schedule was accelerated to meet the construction deadline of a street re- paving project <br />on Pioneer Boulevard, <br />Southwest District Pipeline Replacement Projects - Gardena, .Hawthorne and Inglewood. As .part of the <br />implementation of their capital improvement program, GSWC contracted with RBF to provide professional <br />engineering services for their Southwest District Pipeline Replacement Project that included pipeline replacements <br />in four separate areas: Project 25003040 - 3,100 LF of 12 -Inch and 8 -'inch DIP in 137th Street, Mariposa Avenue, <br />and Raymond Avenue in the city of Gardena; Project 25003043 - 2,000 LF of 8-inch DIP in 144th Street in the city <br />of Gardena; Project 25003044 - 3,100 LF of 12 -inch and 8 -inch DIP In Imperial Highway and Prairie Avenue in the <br />cities of Inglewood and Hawthorne; and Project 25003045 - 1,300 LF of 8 -inch DIP in Compton Boulevard in .Los <br />Angeles County. <br />�o.ynver6 <br />h <br />w � <br />Client Reference: <br />Dennis P. Cafferty, P.E. <br />Director of Operations & <br />Engineering <br />El Toro Water District <br />949 +837 -7050 x223 <br />dcaffe rtyL�etwd.com <br />Key52aff serving this client: <br />Kevin Gustorf <br />Ten Yokoyama <br />0 <br />El Toro Water District - On -Call Services <br />"The El Toro Water District (District) has been utilizing the professional consulting <br />services of RBF on an on -call and as- needed basis for over ten years. The District has <br />maintained a tong standing professional relationship with RBF for decades. The <br />District has always found the RBF team to be responsive, tschnirally competent, <br />provide a high- quality product and a pleasure to work with.., RBF- continually <br />provides the District with extremely high-quality service, white meeting the project <br />schedules antl stinging within the allocated budget. The District will undoubtedly <br />continue to call upon RBF to serve The District in various capacities, rand 1 can confi- <br />dently recommend RBF as a reliable engineering consultant firm," <br />Dennis Caffetty, P.E., Director of Engineering and Operations, El Toro Water District <br />