SW4 eFcWiTE -__._
<br />7
<br />BS., 2007, Civil Engineering
<br />Civil Engineer, CA, 77660
<br />Laguna Beach County Water Disiricl - Domestic Water
<br />Hydraulic Analysis
<br />Master Plan
<br />Port of Long Beach Sewer Master Plan
<br />Bryan Kallentraugh, BE
<br />13
<br />B.S. Civil Engineering
<br />civil Engineer, CA, 73819
<br />Omngethotpe Avenue Transmission Main �.
<br />WaterNVaefewater Facilities
<br />GSWC Southwest Dlsti tPipeline Replacement
<br />Rhonda Tijerina, PE, LEED AP
<br />36
<br />B.S,, Electrical Engineering
<br />Electrical Engineer, CA, 15473
<br />Baker Regional Water Treatment Plant
<br />Bectical iinstrumentationl
<br />(also registered in NV)
<br />Rio Vista Valve #2 Vault Modifications
<br />Controls
<br />_
<br />LEE1Accredited Professional
<br />Electrical /Controls - multiple pump stations
<br />Alan AShimine
<br />15
<br />B.A., Environmental Analysis
<br />Capistrano BlUffslPines Park Sewer
<br />Environmental
<br />and Design
<br />rare Reservoir No, 2
<br />Richard Beck, DER PWS, CPESC
<br />15
<br />B.A., Environmental Studies
<br />MulUpie certifications- see resume
<br />County of Orange On -Call Epvucmmentaland
<br />Environmental _
<br />Re tilato Services
<br />Sal Sheikh, PE
<br />30
<br />M.S., Civil Engineering
<br />Grit Eaginear, CA, 32677
<br />MNWD Seismic Assessment of Reservoirs
<br />Structural
<br />(Structures)
<br />(also registered in OH, AZ, NV, UT
<br />Baker Regional WaterTmatment Plant
<br />B.S., Civil En Ineerin 9
<br />Middle Chi uld Canyon Water Facilities
<br />Bill Cox, PLS
<br />36
<br />33.,BUSiness Administra-
<br />Professional Land Surveyor, CA, 6673
<br />Alton Parkway Construction Survey
<br />Surveying
<br />tion
<br />Colorado River Aqueduct As- Needed Survey
<br />County - ofOrange On all Services
<br />Art Boston!, PhD; PE, CE
<br />20
<br />Ph.D., and MS,, CNLI and
<br />Geolechnical Engineer, CA, 2458
<br />SMWO - MiddleChl §Oita Canyon Reservoirs
<br />GMU Geatacholcal Engineering.
<br />Environmental Engineering
<br />Civil Engineer, CA 53924
<br />VVWRA interceptor Phases 18,2
<br />8.5 „Civil€ ineerin
<br />_
<br />City of Los Angeles Pipeline Breaks in Summer 2008
<br />SUBCCINSULTANT SERVICES
<br />T 23241 Arroyo Vista, . Rancho Santa Margarita, CA 92688 1 Phone 949.888 6513
<br />a.acua.%Z;.u: GMU Geotechnical Engineering, Inc. (GMU) has more than 40 years of experience evaluating soil
<br />and rock conditions for clients before, during and after construction to verify stability, meet performance goals and
<br />reduce the potential for unexpected problems. GIVI engineering geologists and geoteclinical engineers are
<br />specialists in evaluating soil, rock and groundwater conditions for proposed and existing projects,
<br />■ M
<br />i %a F°rcrcr, Client Reference: I
<br />Mr. Jason Yim, P.E.
<br />i Principal. Engineer
<br />Castaic Lake Water
<br />l Agency
<br />661(513 -1277
<br />jylmC�dwa.orp ,
<br />Key staff serving this client:
<br />John Nagle'',
<br />Cindy Miller
<br />Steve Conner
<br />Tort YokoYama
<br />Castaic Lake Water Agency - On-Call Services for Water Facilities
<br />WHA7'DUR CL/6NT5 5AY:
<br />"RBF Consulting 4s a great company to work with. We are pleased with their post
<br />and current work performance and look forward to continuing to work with them.
<br />John Nagle is a great person to work with and is a proactive project manager....”
<br />Jason yim, R.E., principal Engineer
<br />Castaic Lake Water Agency
<br />Castaic Lake Water Agency (CLWA) is a public water wholesaler that provides about
<br />half of the water that Santa Clarita households and businesses use. RBF provides on
<br />call engineering services to CLWA for facilities evaluation and design
<br />improvements. Example projects include the following
<br />A Rio Vista Valve #2 Vault Modifications - 72: -inch Valve Replacement Project
<br />a Pipeline Inspection Program Planning and Development
<br />A Sand Canyon Pump Station Generator Installation - Constructabitity Review, Construction Management and
<br />Inspection Services
<br />e Castaic Conduit Bypass Transmission Main- ConstructabilityReview
<br />6 Castaic Conduit Erosion Protection. Analysis
<br />IN
<br />
|