My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 5 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RBF CONSULTING 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 10:10:51 AM
Creation date
9/8/2014 4:51:23 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2014-130
Agency
PUBLIC WORKS
Council Approval Date
6/3/2014
Expiration Date
6/30/2015
Insurance Exp Date
8/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach <br />UNDERSTANDING <br />The City of Santa Ana Is committed to serving its population of 325,000 people with reliable and high - quality water and <br />sewer service. As part of this commitment, the City desires to select two consultants to provide engineering services on <br />an as- needecl basis.. The services in general will consist of water and sewer main replacement design projects on arterial <br />.highways, local roads and public right of way citywide. The projects also may include general street improvements. <br />Environmental studies and documentation in accordance with CEQA will be required on all projects. Other services may <br />also include construction management and inspection, mechanical, electrical, structural, and /or surveying. Other design <br />projects may Include pump stations; wells, reservoirs, utility vaults and sewer lift stations. <br />The on -call consultant must have a proven approach in designing water and sewer main <br />projects in busy arterials and commercial areas, Addressing the concerns of the surrounding <br />_.. community and businesses and minimizing each project's Impact to them are just as <br />_ - important as properly designing a pipeline. The RBF team is eager to establish an excellent <br />working relationship with the City through exemplary service, design expertise, and a smooth <br />design process, We have had great success providing on -call services with several local clients, <br />as well as providing water and sewer main designs for a multitude of clients, our team's design approach is <br />founded on the principles of choosing a highly qualified team, encouraging Innovative thinking, embracing the <br />concept of value engineering, performing alternative analyses, and implementing . day -to -day proactive project <br />development This allows us to develop the best solutions for the City. Our philosophy combined with open <br />communication with the city during: all project phases will ensure a successful project. RBF's project approach will <br />ensure the upfront preliminary engineering is completed properly to successfully move forward with final design <br />and construction within the project schedule and budget. RBF's approach to delivering quality project to the city <br />Incorporatesthe following hey elements: <br />• Understanding the City's concerns, goals, and expectations. <br />• Placing expert personnel in positions to address those concerns and meet the City's goals and <br />expectations. <br />• Proactively communicating analysis results and potential conflicts in order to make informed decisions in <br />a timely manner. <br />• Identifying and addressing key project issues, <br />• Implementing a thorough QA /QC program, <br />RBF will carefully manage each phase of work in accordance with the required elements and major milestones, <br />During the kickoff meeting, these Items will be reviewed with the City to ensure the project goals and special <br />concerns are identified upfront. Careful consideration in the upfront planning and design will be achieved by <br />creating a work plan encompassing all project elements. The successful implementation of the work plan requires <br />early Identification of key issues that need to be evaluated during field investigation and preliminary design. This <br />upfront planning will allow RBF to ensure the project stays on schedule and that the City's goals are met, <br />The success of each project will be the responsibility of RBF's Project Manager — Mr. John Nagle, the City's main <br />point of contact. John's knowledge and experience with providing on -call services to clients, and specifically <br />pipeline design will ensure appropriate resources are allocated for each task order and provide for a focused <br />implementation of each work plan. In addition to his own experience, John will utilize the experience of RBF's in- <br />house design staff experts in the various fields required for the on -call services including but not limited to: <br />emdronmentai, survey, structural, electrical, mechanical, transportation, traffic, and permitting, The approach <br />allows each member to operate efficiently within their expertise, so each project can be completed correctly, on <br />schedule and within budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.