Key Issue 1#1 Agency Coordination. Two agencies we will need to coordinate with are County Flood Control and <br />Orange County Sanitation District (OCSD). We have an excellent working relationship with the permitting staff at <br />the County, We will able to immediately obtain as- builts for the channel /box culvert -in fact, County staff has such <br />familiarity with us that they allow us to take their mylar as- builts off site to make copies at any time we need. We <br />are also aware of the County's design requirements for clearances from their facilities. <br />We also have a lot of experience with OCSD. We currently have an on -call contract <br />with them. We have extensive experience in connecting to their facilities and <br />designing facilities in their collection system. We understand the process of obtaining <br />a connection permit and are familiar with their standards. <br />Key Issue #3: Construction into Segerstrom Avenue. Segerstrom Avenue Is a busy <br />street and each of the four north /south streets of the water main project will require OCSQmanlloleatMyrtle Street <br />replacing the pipeline within the street. This will also require construction through the tindoristoJSteet <br />easements at the end of the cul -de -sacs for Rene Drive, Rita Way., and Pacific Avenue, There are two basic options <br />for construction. one option Is to construct the pipeline via . open cut trench, which requires having to replace any <br />trees, hardscape, and walls that are existing. The other option will be to use a trenchless form of construction from <br />the end of the cul -de -sac to the connection point in Segerstrom Avenue. This would eliminate extensive damage <br />and replacement to the existing facilities, . and also reduce the impact in Segerstrom Avenue. <br />Attend kick -off meeting with City staff to review project scope, schedule, budget, work plan, design <br />criteria, and parameters. <br />Deliverables: <br />I. Meeting Agenda <br />ll, Meeting Minutes <br />2, Data Gathering <br />a. Obtain all available records from the City and scan to pdf pertinent documents for the project. <br />b. Perform site walk and take photographs of existing project area. <br />c. Deliverables: <br />1. PDF scans of City documents <br />ii. Photos <br />3, Utility Research <br />a. Perform utility research through Dig Alert website. Contact . all companies listed . within the project <br />limits and request utility information.. There shall be a minimum of requests made to each company <br />in an attempt to obtain their Information. <br />It. Perform utility research with agencies known to not be in Dig Alert website if applicable (ie. County <br />storm drains). <br />n <br />