My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 5 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RBF CONSULTING 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 10:10:51 AM
Creation date
9/8/2014 4:51:23 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2014-130
Agency
PUBLIC WORKS
Council Approval Date
6/3/2014
Expiration Date
6/30/2015
Insurance Exp Date
8/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 2. Regular monitoring Involves comparing the actual progress of the work to the project plan and <br />determining whether the project Is progressing in accordance with the plan, both in terms of time and <br />cost, A key component in this step is the Drawings and Deliverables Progress Report, which shows the <br />actual percent complete of each drawing or other deliverable in production. This report also identifies <br />and reports on specific critical path tasks essential to production of the Drawings and Deliverables. This <br />report is completed by the functional leatlers. <br />Step 3. Identifying the causes of and corresponding delays and cost overruns Involves the Project <br />Manager working with the appropriate functional leader responsible for the job's progress ensuring that <br />corrective action is taken immediately to meet the agreed to schedule. <br />Scheduling, monitoring and cost control are integrated by execution of the following activities: <br />r Upon execution of the contract, the Project Manager will designate a Project Control Manager. <br />s� To the extent required . for the scope of the task orders, establish the master schedule and re- source <br />requirements in accordance with the WB5, so that cost, schedule, and responsibility are integrated into <br />discrete work packages for budgeting and monitoring purposes. <br />P- The Project Manager, working with the Project Control Manager, the technical director, and the <br />functional leaders, will complete the final project schedule and budgets for direct labor and overhead, <br />subconsultant costs and other direct costs, <br />o� As warranted by the scope of work, the Project Control Manager will monitor expended costs and actual <br />progress (earned value) against the budget for each task. Forecast cost to complete will be updated <br />monthly, based on actual progress information provided by the technical director and the functional <br />leaders, <br />w The detailed project control reports will be produced weekly for review by the Project Manager, <br />Project Wrap Up - To ensure a top quality product and to optimize the quality of future projects, the Quality <br />Assurance Manager will assure that the following activities take place: <br />o, On completion of PS &E, each quality Control Manager will compare the final PS &E.towhat was approved <br />in the final Independent check. All plans for work in the same geographic locations will be layered and <br />compared to ensure the Contractor Is not receiving conflicting messages. <br />s <br />The Quality Assurance Manager shall review all certified independent checks to ensure that all final work <br />has been checked, all contract documents and special provisions are non - conflicting, and have <br />appropriate engineer signatures. <br />Upon completion of the contracted work;. the Quality Assurance Manager will assure that all files In the <br />Record Center are updated to include all relevant approved files. <br />P� upon completion of the contracted work, the Quality Assurance Manager and the Project Manager will <br />review the project files with the client's Project Manager to determine files to be transferred,.. <br />In summary, the Total Quality Management Program is used to prevent errors and omissions before they occur by <br />giving every Project Team Member the respect, information, and rapid feedback he or she needs to produce an <br />accurate, consistent and complete product. This approach reduces cost and effort required for the quality control <br />phase, which provides for the systematic elimination of all defects from the planning reports and construction <br />documents. Further it provides for continuing future upgrading ofquality performance. <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.