My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sport fields, sport courts, playgrounds, plants and all other areas to the quality described in these <br />specifications and interpreted by the Director's Representative. <br />C. EXTRA WORK <br />It is the City's intent to keep parks and other public recreational sites in a beautiful and exceptionally <br />well maintained condition. This specification is designed to continuously improve parks and public <br />recreational sites. It is with this intent in mind that the Director's Representative may consider <br />authorizing extra work. Extra work will not be initiated without written authorization. In emergency <br />situations, a not to exceed price may be submitted by contractor via e-mail for revlewlapproval by City. <br />The Director's Representative may request that the Contractor submit proposals for extra work in order <br />to repair or improve the grounds- landscape In the contract sites. The Contractor shall submit proposals <br />using the City's Proposal for Authorization for Extra Work (AEW) spreadsheet (see Attachment _ <br />The Contractor shall complete the spreadsheet in its entirety using hislher proposed extra work pricing <br />(that is a part of this agreement) in order for the proposal to be considered. City reserves the right to <br />request materials /equipment receipts with invoices. All labor shall be quoted on a "not to exceed" basis <br />and City will only pay for labor actually incurred. City will pay up to 10% mark -up on parts. <br />D. OUTSIDE OF SCOPE <br />Damage or malfunction to plant material or irrigation system equipment (from valve to water meter), <br />with the exception of irrigation heads and lateral lines, by any of the following may be considered <br />outside the scope of this Agreement: <br />(1) Acts of God <br />(2) Civil Disorder <br />(3) Vehicle Collision (excluding Contractor and its employees and subs) <br />(4) Excavation or re- surfacing of the street <br />(5) Power failures <br />(6) Underground wiring damage <br />Contractor will not be considered responsible for replacement. Contractor must prove to the <br />satisfaction of Director that one of the above occurred in order to be excused from performing under the <br />Agreement. <br />1. Scheduling of Work— Routine Maintenance <br />a) The Contractor shall provide landscape /grounds maintenance between the hours of <br />6:00 a.m. and 6:00 p.m., Monday through Sunday. The schedule may be modified only <br />with the Director's Representative consent. Landscape /grounds maintenance that <br />generates excess noise cannot begin before 6:00 a.m. <br />b) The Contractor shall establish schedules of "routine work" to be followed In the <br />performance of this contract. In addition to the Contractor submitting the Monthly Park <br />Maintenance Inspector's Inspection Schedule and other required monthly reports, the <br />Contractor shall submit weekly schedules listing the work tasks, crew performing the <br />task, and the projected hours to complete the task. The schedules shall be emailed to <br />Director's Representative by Thursday at 4:OOpm for the upcoming week. Any changes <br />in scheduling shall be reported in writing 48 hours before the proposed change and must <br />be approved by the Director's Representative. The schedule shall Include days of the <br />week and what person /crew will be performing specific work in accordance with the <br />specification. <br />Districts t, 4 and 5 Park Landscape RFP <br />19Pif-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.