My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Work Force <br />Your proposal will be evaluated on the qualifications of this individual and the amount of <br />FTE's you assign to each district. Copy of certificates and qualifications is required with <br />proposal submittal. <br />a) Contractor's supervisory personnel (Supervisors) shall have five years' landscape <br />maintenance experience and have: 1) an Associate in Science degree from Mt. San <br />Antonio College in Ornamental Horticulture, Parks and Sport Turf Management or two <br />Skill Certificates in Landscape Irrigation, Landscape and Park Maintenance, Park <br />Management and Sports Turf Management; 2) Associates in Science from Fullerton <br />College in Landscape Management, Ornamental Horticulture or a Certificate of <br />Proficiency in Landscape Design and Management; 3) Turfgrass Management <br />Certificate from University California Riverside; or 4) an approved equal Associate in <br />Science degree or related certificate 30 units or greater (see Attachment _). Failure of <br />the Contractor to provide a Supervisor who possesses the minimum qualifications listed <br />above shall cause the City to penalize the Contractor up to $300 per day and to hire a <br />consulting Supervisor that meets the qualifications listed above. The cost of hiring the <br />consulting Supervisor shall be withheld from the Contractors monthly invoice. <br />Supervisors shall possess landscape /grounds management skills required to Implement <br />modern methods and newly developed horticultural and arboriculture procedures and/or <br />practices. Supervisors shall accompany the Director on weekly inspection tours of the <br />contract sites. During the tour the Supervisor shall indicate the work completed the <br />previous week, any changes that were made or are being contemplated and the work <br />scheduled for the upcoming week and month, <br />b) The Contractor shall provide the appropriate number of Certified Master Irrigation <br />Technicians, Certified Irrigation Technicians and Certified Irrigation Technician <br />Assistants in each district to audit, report, inspect, design, improve, restore, repair, <br />recommend improvements and manage the City of Santa Ana's park irrigation systems <br />using sustainable water conservation methods and practices. The City shall determine <br />what the "appropriate number" of certified staff shall be based upon the existing <br />condition of the irrigation systems and the overall health of the landscapes. Failure of <br />the Contractor to provide the appropriate number of certified staff who possess the <br />minimum certification credentials for each class of irrigation technician shall cause the <br />City to penalize the Contractor up to $300 per day for each number of irrigation <br />technicians not made available to the City and to cause the City to hire certified Irrigation <br />technicians and withhold the cost of hiring irrigation technicians from the Contractors <br />monthly invoice. who possess, at minimum, the qualifications described below: <br />(1) Certified pilaster Irrigation Techs (CMIT) shall be a current Irrigation Association <br />Certified Designers, Certified Landscape Irrigation Auditors and Certified Landscape <br />Water Managers (see Attachment _). The Master Irrigation Techs shall : 1) Conduct <br />annual water audits for each irrigation system per the Irrigation Association <br />Recommended Audit Guidelines and produce an annual report identifying each sites <br />systems deficiencies and providing system design engineering recommendations that <br />restore the system to optimum operating condition including all systems having matching <br />precipitation nozzles and head -to -head coverage and all other recommendations that <br />fully restore systems to optimum operating conditions; 2) record monthly water usage via <br />each parks water meter and Calsense irrigation controller download data. The data <br />collected from each park site shall be submitted in a Monthly Park Water Conservation <br />Districts 1, 4 and 5 Park Landscape RFP <br />1 x'23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.