My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Representative shall direct the Contractor to mow the sporVpriority turf lower than 1/2" If <br />necessary. Note that the ball diamond infield maintenance sub - contractor shall be <br />responsible for mowing turf infields, including foul territory turf area, 36" beyond the <br />skinned infield arc, and other designated ball diamond turf areas. (see Attachment 1). <br />c) Edging and Detailing <br />Edging /detailing shall be performed at the same time mowing occurs. <br />All edging shall be performed with the use of a McClain's edger or approved substitute <br />walk - behind edger. Stick edger's are not allowed where turf meets pavement. <br />Contractor shall edge all turf adjacent to all improved hard surfaces such as concrete, <br />decomposed granite, asphalted concrete paved areas, pavers, etc. <br />Edging /detailing may occur with string trimmers around park amenities that are not <br />immediately adjacent paved surfaces. <br />Chemical detailing of turf may occur only with the Director's Representatives approval. If <br />chemical detailing is performed, the Contractor shall spray maximum 3" and use the <br />string trimmer to remove the treated turf within one (1) week after symptoms of <br />phytotoxicity become recognizable. Any visible clippings or soil, on the turf or hardscape, <br />shall be collected and disposed of pursuant to SAW Chapter 16. <br />(1) The Contractor shall use the McClain's edger, or approved substitute, to edge <br />straight lines along fences, walls, or long flowing arcs. The Director's <br />Representative may require the Contractor to use string or rope lines to edge <br />straight lines if the Contractor's staff fails to achieve this quality without this <br />method. <br />(2) The Contractor shall detail around trees, along walls /fences and other park <br />amenities first using a sharpened shovel out to establish a concentric round circle <br />around trees, poles, etc. Once the initial detailed circle is established a string <br />trimmer may be used to maintain the circle. Should the circle begin to deform the <br />Director's Representative shall direct the Contractor to repeat the detail process. <br />Shovel cut detailing shall be repeated a minimum of every 3 months to maintain <br />crisp evenly round lines. <br />(3) The Contractor shall detail turf not greater than 1" away from park amenities <br />walls or fences. Detail lines shall be made straight and shall be maintained <br />straight. The Contractor shall, at his own cost, supply sandy loam top soil and an <br />approved turf sod to reduce any existing bare soil areas along walls1fences that <br />are greater than 1 ". <br />d) Fertilization <br />(1) Casual Turf - Contractor shall apply fertilizer once per year (first week of <br />January) per the City's agronomic plan (see Attachment 4). <br />(2) Sport /Priority Turf - Contractor shall apply fertilizer three times per year (first <br />week of January, July, and with annual renovation) per the City's Agronomic <br />Plan" (see Attachment 4). If no summer renovation occurs, the application shall <br />be applied as determined by the Director. <br />e) Irrigation -All Turf <br />Dlstrlcts 1, 4 and 5 Park Landscape RFP <br />1 227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.