My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Contractor shall ensure irrigation schedules are continually monitored to <br />provide adequate moisture in the soil for healthy turf, and avoid excess wet <br />conditions. The Contractor shall visually check all sites each morning and <br />physically check each sites systems monthly indicating in writing the: 1) site <br />name; 2) the controllers manufacturer, model and serial number; 3) controller <br />letter /number; 4) run days; 5) start times; 6) station run times; 7) water budget <br />percentage; 8) weekly Et; 9) deficiencies noticed; and, schedule to curelrepair <br />deficiencies. <br />(2) Contractor shall not schedule irrigation of casual turf or sports fields that <br />would impact programs /events or at least 24 hours prior to the mowing process. <br />During cooler periods of the year avoid irrigating 48 hours prior to the mow <br />procedures to ensure a quality cut of the turf. <br />(3) Under normal conditions the contractor shall not schedule irrigation on Friday <br />and Saturday nights to avoid wet conditions during weekend usage. Prior <br />approval will be required to irrigate during weekends to coordinate with <br />reservations. <br />(4) Turf areas shall be watered as required by weather conditions to provide <br />adequate moisture for optimum growth. At no time shall turf areas show a lack of <br />green color or a loss of resilience due to lack of water. If Contractor estimates <br />additional water above and beyond the monthly Estimated Applied Water (EAW) <br />may be needed, he/she shall request approval from Park Services prior to <br />exceeding the monthly irrigation budget as detailed in the Monthly Water <br />Conservation Report Estimated Applied Water (EAW) requirements. Failure to <br />get approval from Park Services prior to exceeding the monthly irrigation budget <br />will result in the Contractor paying for the excess water. <br />(5) When an irrigation system does not adequately provide water to the turf area <br />in which it is installed, due to any reason Including but not limited to controller <br />failure, valve failure, broken heads, poor system design, etc., the Contractor shall <br />direct their CITA's to immediately provide supplemental irrigation at no extra cost <br />to the City. The Contractor may use any reasonable means necessary to <br />uniformly irrigate turf areas. Contractor may also submit AEWs with engineered <br />drawings to improve these areas of the system. Failure to maintain turf in a green <br />and healthy condition will result in deductions from the monthly invoice. <br />(6) Automatic irrigation shall be conducted between the hours of 10:00 p.m. and <br />4:00 a.m. and shall be programmed not to exceed the EAW. In the event that <br />Contractors water consumption exceeds the EAW City may deduct said <br />overages from the Contractor's monthly invoice. <br />(7) Contractor shall ensure that all Certified Irrigation Master Technicians (CIMT) <br />Certified Irrigation Technicians (CIT) and Certified Irrigation Technician Assistant <br />(CITA) working on Irrigation possess the following credentials: <br />Certified Irrigation Master Technician <br />a. Irrigation Association Certified Irrigation Designer <br />b. Irrigation Association Certified Landscape and Irrigation Auditor <br />c. Irrigation Association Certified Landscape Water Manager <br />_...._.._ Districts 1, 4 and 5 Park Landscape RFP <br />19Pfeh <br />
The URL can be used to link to this page
Your browser does not support the video tag.