My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Inspection and Reporting <br />(1) The Certified Irrigation Master Technicians shall physically inspect the <br />operation of all irrigation systems once a month and prepare a written report <br />specifying park name, controller location /name, start times, run times, program <br />name, station number, water budget percent, weekly Et and deficiencies. All <br />deficiencies shall be cured /repaired within two working days or the Director's <br />Representative shall impose penalties for failure to respond and/or hire a <br />Certified Irrigation Technician to remedy the system. The Contractor shall <br />maintain all sprinkler systems using City standard irrigation products and details. <br />All repairs shall be to City of Santa Ana Park Services specifications and details. <br />Repairs to irrigation heads shall be with matching precipitation nozzles. <br />Contractor shall ensure that excessive over spray /runoff into street right -of -ways <br />or other areas not intended to receive irrigation is controlled. The Contractor <br />shall repair at his own expense any irrigation head and lateral line rendered <br />inoperable or malfunctioning due to attrition, vandalism, etc. All repairs shall be <br />performed by Certified Irrigation Technicians and shall be "tagged" using the City <br />of Santa Ana Park Services "tagging" system noting the Company and Irrigation <br />Tech that performed the repair, the date of the repair and the Contractor's and <br />Irrigation Technicians contact information. All repairs shall be warrantied for two <br />years from the date of the approved repair. All head and lateral lines shall be <br />repaired within two days of discovery of malfunction /repairs needed. All other <br />irrigation repairs shall be performed immediately following approval of the work. <br />(2) The CMIT shall perform a daily visual inspection of all irrigated areas first <br />thing each morning. All areas receiving marginal coverage shall receive <br />supplemental irrigation by being irrigated by a portable irrigation method. The <br />contractor shall furnish all portable hoses, nozzles, sprinklers, etc., necessary to <br />accomplish this additional irrigation. Care shall be exercised to prevent a waste <br />of water, erosion, and /or detrimental seepage into existing underground <br />improvements or structures. <br />e) Repairs <br />The Contractor shall be responsible for repairs to all irrigation heads, swing joints and <br />lateral lines as a part of this agreement. The Director's Representative will be <br />responsible for repairs to the irrigation system from the valve to the water meter. <br />8. Hardscape Maintenance <br />All non - pedestrian parking lots, curb gutters, stamped or other enriched hard roadway <br />surface areas, shall be thoroughly cleaned once per week. The Contractor shall hire a <br />sub - contractor specializing in parking lot cleaning. The work shall be performed by the <br />sub - contractor in the early morning hours or at a time of day that will not disturb <br />residents. If the work is to be performed during the day, the sub - contractor shall develop <br />a strategy to close off parking lots to prevent people from parking so he /she may clean <br />the entire parking lot. Vacuums, blowers, sweepers or other approved equipment may <br />be used to clean hardscape areas. Debris shall not be blown or swept onto adjacent <br />planters, streets or property. All debris must be picked up by the sub - contractor and <br />removed from the site. Debris and litter that shall be cleaned includes, but is not limited <br />to, leaves, twigs, branches, loose rock, sand and trash. The City shall approve any <br />equipment that is to be used for cleaning parking lots. Large trash Items in excess of <br />MmmMDistricts 1, 4 and 5 Park Landscape RFP <br />19L� 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.