My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - PARK MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
19E - RFP - PARK MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 4:09:32 PM
Creation date
9/11/2014 3:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
19E
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drinking fountain be so plugged that dismantling the fountain is required the Contractor <br />shall notify the Director immediately so City staff can make the repair. <br />9. Playground /Tot -Lot Areas <br />a) Daily Maintenance - The playgroundltot -lots shall be blown free of debris, sand /wood <br />chips on play equipment, rubberized fall areas and surrounding concrete areas daily. <br />Any sand /wood chips that accumulate on the rubberized surface shall be reused. <br />Sand (wood chips and debris on the playground equipment shall be removed. <br />b) Weekly Maintenance - The Contractor shall loosen compacted sand /wood chip <br />areas, re -grade sand /wood chips areas to level condition (eliminating ruts, depressions, <br />build up areas, etc,), sifting of sand /wood chips to assure that debris and any other <br />foreign objects are removed, removal of weeds, and remove exposed filter fiber and <br />dispose of. <br />c) Bi- weekly Pressure Washing - The Contractor shall pressure wash playground <br />equipment, rubber surfaces and surrounding concrete areas to remove dust, grime, <br />stains, gum, etc. every other week. <br />d) Annual Turf Berm Renovation - The Contractor shall eliminate berms (including pre- <br />existing) in the turf surrounding or in the vicinity of playground /tot -lots by sod <br />cutting /removing existing turf berms a minimum of three rows wide of sod, leveling to the <br />appropriate grade, re- sodding with thick out Greg Norman 1 Hybrid Bermuda sod and <br />rolling the sod with a 1.5 ton asphalt roller used for sod compaction. <br />e) The City shall be responsible for all playground equipment and tot -lot area safety <br />inspections. <br />10. Ball Diamond Maintenance <br />The Contractor shall retain a City approved sub - contractor to provide ball diamond infield and <br />warning track maintenance as set forth in Attachment 1. The Contractor shall also establish a <br />Sport Turf Management crew to specifically perform specified sport fieldlturf maintenance. <br />a) Daily Baseball Perimeter Maintenance <br />Ball diamond perimeter maintenance shall be performed daily. Ball diamond perimeter <br />maintenance shall be defined as all areas outside the field of play and sideline /dugout <br />areas where coaches, players and others associated with the game gather. Ball <br />diamond perimeter maintenance areas shall include but is not limited to grandstands, <br />areas around concession stands, fence lines, warm -up areas, etc. The work that shall be <br />performed on a daily basis shall include picking up trash and debris, blowing off areas to <br />remove brick dust, stains and /or all other foreign material, such as sunflower seeds or <br />peanut shells, so that all areas, including bleachers, backstops, pavement and <br />landscape areas, are 100% free and clean. All debris mentioned above shall be <br />collected and dispose of. Blowing debris into turf or adjacent areas is not acceptable. <br />b) Daily Outfield Maintenance <br />(1) Irrigation checks and repairs to assure that irrigation heads are at the proper <br />grade to avoid injury to players who may fall on them and that no "slippery' areas <br />exist. <br />Districts 1, 4 and 5 Park Landscape RFP <br />19M 339 <br />
The URL can be used to link to this page
Your browser does not support the video tag.