Laserfiche WebLink
City of Sontd Ana • RFP l�14 036 Landscape Archliecatural Design for Pacific Electric Park rommontry Imp trod apaaes 1h <br />R J M GROUP <br />Project UnderstGnding t�ROUe�p <br />N. Meet with City Staff to review final Design Development Plan, Preliminary Planting Concept Plan, <br />Preliminary Irrigation Concept Plan, Preliminary Lighting Concept Plan, and Preliminary Opinion <br />of Probable Construction Costs prior to construction document preparation. <br />TASK 3 - CONSTRUCTION DOCUMENTS <br />During this phase, the contract documents are prepared setting forth in detail the requirements for the <br />construction of the project based upon the approved design development drawings. General conditions, <br />instructions to bidders, and all special requirements are defined, and when combined with the various <br />trade specifications, a complete project manual will be produced. Construction drawings will be submitted <br />at90R/ o completion for City staff review and revised per City comments, The 100% complete construction <br />drawings will be submitted for City review and approval. A revised cost estimate will also be submitted <br />with a final "engineer's estimate" submitted with the final bid documents. Structural engineer's design <br />calculations will be submitted with the final bid documents. <br />The construction documents will include complete landscape architecture, architectural, and engineering <br />design documents required to execute the project. Specifically, we have included the following disciplines. <br />A. <br />f7 <br />Landscape Design /Documentation <br />Services during the construction document phase consist of preparation of drawings and <br />specifications based on approved design development documents, setting forth in detail the <br />landscape requirements for the project including: <br />1. 'Title sheet <br />2. Site construction /layout plans <br />3. Planting plans /details /notes <br />4� Irrigation plans /details /notes <br />S. Landscape construction details <br />6. Structural details related to site landscape <br />elements <br />Note: Demolition Plans are not part of the <br />Scope of Work, <br />Architectural Design /Documentation <br />Services during the construction document phase consist of preparation of drawings based on <br />approved design development documents, setting forth, in detail, the architectural construction <br />for the restroom building (Estimated 700 s.£). <br />25D -37 <br />SAN JUAN CAPISTRANO. 9AORAMCNTO 8 <br />www 9JMd86I91)9r0UP.00M 1 (949) 49aQ600 . <br />