Laserfiche WebLink
y o Ano - RI-P IP14 036 Landscape ftriltechural resign for Paclflc Electric Mrk .• PA <br />Ci[ of Sanl community rnsplm�d spaces �� <br />DESIGN <br />Project Understanding R M GROUP <br />Architectural <br />1. Building Floor Plans <br />2. Foundation Plan Plans <br />3. Roof Framing Plans <br />4. Reflected Ceiling Plans <br />S. Exterior elevations <br />6. Roof Plans <br />7. Interior elevations of the restrooms and other critical areas <br />8. Architectural Details <br />9. Door Schedules and details <br />10. Structural Details, Calculations <br />11. Plumbing Plan, details and notes <br />Mechanical (related to architecture) <br />1. It is anticipated that the restroom building will be naturally ventilated and therefore <br />mechanical plans and details will not be required. <br />C. Civil Design /Documentation <br />Services during the construction document phase consist of preparation of final civil engineering <br />calculations, drawings and specifications based upon the approved design development documents. <br />1. 'Title sheet /details <br />2. Details /section sheet <br />Citrus Ranch Park, Tustin, CA • Citrus Theme <br />9 SAN JUAN CANSrRANO- SACRAMENTO <br />wwW.RJMdeslUnRroup.00m - [4491499.2600 <br />The Park of Riverwall(Restroom Building <br />25D -38 <br />