W.A. RASIC CONSTRUCTION COMPANY, INC.
<br />REFERENCES
<br />OWNERIAGENCY LOCATION DATE CONTRACT CONTACT
<br />COMPLETED AMOUNT NAME PHONE
<br />Since 1978, W.A. Rasic Construction has the ability to constructs wide range ofprojects both in terms orsbre and type. From $5,000
<br />utility installations to multi- million dollar pipeline projects, W.A. Rasic Construction has constructed some of the most difli civil
<br />construction projects in the Western United States. Our capabilities include Water / Wastewater (Transmission /Distribution /
<br />Treatment) Pipelines, Storm Drainage, Concrete Facilities, Dry Utilities (communication /electrical), Mechanical Piping, Petroleum
<br />Systems, Demolition and Crushing, Inspection Services, Design -Su/ld Projects, Extensive Shoring, and Emergency Response Services.
<br />We proudly stand as one of the few contractors with the flexibility, diversity, and capability to span the full spectrum of civil
<br />construction. While self - performing over 1,000 contracts yearly, W.A. Rasic Construction has listed below some of our signature
<br />projects that represent over 400 million dollars In project references. For addltional project references, please contact W.A. Rasic
<br />Construction or visit our website at www.warasle.com.
<br />COUNTY OF SAN LUIS OBISPO Los 01 Ca Um 14 $29,425,D00
<br />James Bradley, P.E. (805) 001 -6162
<br />Los Cape Wastewater Collection System ProjectAreas 8 &C
<br />This project involves the Installation of 81,306df of Sewer gravity mains ranging In size from 8 to 18 inches, 17,515 -If of Sewer
<br />force mains ranging from 3 to 16 Inches, 283 manholes, 1,757 service laterals, 27,0194f of fiber optic conduit, and 27,264 -If of,
<br />recycled ar luent force mains ranging from 2 to 12 inches, The project also included Wet Wells and ancillary items consisting
<br />of one Pocket Pump Station, three Duplex Submersibel Stations, and one Triplex Station, Other work includes an effluent
<br />disposal system consisting of site preparation and 19,77641' of subsurface perforated pipe and arched infiltration chambers
<br />This environmentally sereifive project will provide wasmater collection, conveyance, Vestment, and recycled
<br />water reuse for the Los Osos communfly that is current unsewered and utilized septic tanks,
<br />ORANGE COUNTY PUBLIC WORKS Yorks Linda, Ca — dm.13 $41,650,000
<br />Ju Kim (714)975-0126
<br />SARI Relocation Including Metering Station
<br />iu khro@oCaw ocao tom
<br />This project involves the installation of 20,630 -If of 54" FRP Sewer and associated structures along the Santa Ana River
<br />to replace the aging existing 42" Interceptor Sewer. Open cut Installations range from 1 V to Whoop along the existing
<br />levee roads. There Is also 2,808 -If of 84" RCP casing installed via Slurry Microtunneling method, up to ten
<br />tunneling shafts at depths to 70' deep, concrete inlet and outlet structures, a below ground metering station, and elaborate
<br />dewatedng system. This highly orchestrated project includes mitigation measures for wild life, native plants and birds,
<br />bicyclists, and campers within the project site
<br />LOS ANGELES WORLD AIRPORT Los Angeles, Ca March 13 $30,000,000
<br />Tyler Chappell (310) 351 -5907
<br />Central Utility Plant Replacement Project
<br />Construct chilled water supply and return lines, hot water supply and return lines, domestic water supply, reclaimed water
<br />supply, underground power and communication systems to supped the new Central Utlllty Plant (CUP) In the wards 61h
<br />busiest airport. Project includes providing BIM modeling for all portions of the underground work, excavation and the
<br />installation of beam and plate shoring for the majonly of the 18 miles of total new piping installation, Other work includes
<br />cast in place vaults, extensive traffic control, tunneling underneath word way Into the new Tom Bradley International
<br />Terminal and asphalt restoration.
<br />CALLEGUAS MUNICIPAL WATER DISTRICT Moorpark, Ca Oecembervl2 $6,275,000
<br />Shonna Summer, P.E. (805) 579 -7156
<br />Emergency Pipe Procurement and Storage
<br />Procurement of emergency steel pipe, liners, cylinders, fittings, and appurtenances varying in size from 14" diameter to 72"
<br />diameter to be stored onsite for future emergency repairs to Calleguas MIND facilities This work also Includes site work and
<br />grading to place and bury selected pipe and filings underground for storage, above ground cylinder storage bays, and
<br />construction ofaprefabricated metal building warehouse,
<br />YUCAIPA VALLEY WATER DISTRICT San Bemerdino, Ca August-18 $9,350,000
<br />Brent Anton (009) 797 -5118
<br />Yucaipa Valley Regional 8dneline Extension Phase 3
<br />Construction of 24,40Ddf of 20" HOPE birr ins throughout three cities Through existing streets, right-of-ways, and beneath
<br />two waterways. In addition 2,300 -If of 20" HDPE to be installed via directional calling under San Topics Creek and the
<br />Santa Ana River at depths jilietler than 65' deep and 1,800 -If of20 "HOPE to be installed via jacked casing In six locations.
<br />L.A. COUNTY DEPARTMENT OF PUBLIC WORKS Lang Beach, Ca January,12 $24,256,012
<br />Ali Zadeh (626) 4563104
<br />Termino Avenue Drain
<br />The installation of 6,300 linear feet of Cast -In -Place and Precast Reinforced Concrete Box Culvm ranging in sizes up to
<br />Double 9'wx 8'h; 8,800 linear feet of 72" to 18" RCP Storm Drain Piping, 1.200 linear feet of 78" Direct Jack and Bare RCP,
<br />and over 100 Catch Basins equipped Win trash excluder screens and filtration, Other work includes construction of a Low
<br />Flow Diversion Structure to capture and divert non -storm event runoff to existing sewers, installation of a temporary Sheet
<br />Pile Cofferdam, utilization of a groundwater treatment system capable of treating over 1.1 MGD, and removal and
<br />reatment of 6,900 tans of hvdrocarbon contaminated soils,.
<br />LDS NGEtE8 DEPARTMENT of WATER &POWER Los Angeles, Ca anticipated $18,135,518
<br />Charas Ngo (213) 3672319
<br />River Supply Conduit - Unit 3 March42
<br />The installation of 11,200 linear feet of 96" CML&C steel pipe utilizing hydraulic pressed In sheet pile to protect the existing
<br />1940's vintage 66" RCP was dine running parallel to the proposed pipeline. The project will also require 1,400 linear feel
<br />of 108' diameter jacked steel cast , three concrete vaults and a 220 fool deep anode ground bed.
<br />25H -60