Laserfiche WebLink
W.A. RASIC CONSTRUCTION COMPANY, INC. <br />REFERENCES <br />OWNERIAGENCY LOCATION DATE CONTRACT CONTACT <br />COMPLETED AMOUNT NAME PHONE <br />Since 1978, W.A. Rasic Construction has the ability to constructs wide range ofprojects both in terms orsbre and type. From $5,000 <br />utility installations to multi- million dollar pipeline projects, W.A. Rasic Construction has constructed some of the most difli civil <br />construction projects in the Western United States. Our capabilities include Water / Wastewater (Transmission /Distribution / <br />Treatment) Pipelines, Storm Drainage, Concrete Facilities, Dry Utilities (communication /electrical), Mechanical Piping, Petroleum <br />Systems, Demolition and Crushing, Inspection Services, Design -Su/ld Projects, Extensive Shoring, and Emergency Response Services. <br />We proudly stand as one of the few contractors with the flexibility, diversity, and capability to span the full spectrum of civil <br />construction. While self - performing over 1,000 contracts yearly, W.A. Rasic Construction has listed below some of our signature <br />projects that represent over 400 million dollars In project references. For addltional project references, please contact W.A. Rasic <br />Construction or visit our website at www.warasle.com. <br />COUNTY OF SAN LUIS OBISPO Los 01 Ca Um 14 $29,425,D00 <br />James Bradley, P.E. (805) 001 -6162 <br />Los Cape Wastewater Collection System ProjectAreas 8 &C <br />This project involves the Installation of 81,306df of Sewer gravity mains ranging In size from 8 to 18 inches, 17,515 -If of Sewer <br />force mains ranging from 3 to 16 Inches, 283 manholes, 1,757 service laterals, 27,0194f of fiber optic conduit, and 27,264 -If of, <br />recycled ar luent force mains ranging from 2 to 12 inches, The project also included Wet Wells and ancillary items consisting <br />of one Pocket Pump Station, three Duplex Submersibel Stations, and one Triplex Station, Other work includes an effluent <br />disposal system consisting of site preparation and 19,77641' of subsurface perforated pipe and arched infiltration chambers <br />This environmentally sereifive project will provide wasmater collection, conveyance, Vestment, and recycled <br />water reuse for the Los Osos communfly that is current unsewered and utilized septic tanks, <br />ORANGE COUNTY PUBLIC WORKS Yorks Linda, Ca — dm.13 $41,650,000 <br />Ju Kim (714)975-0126 <br />SARI Relocation Including Metering Station <br />iu khro@oCaw ocao tom <br />This project involves the installation of 20,630 -If of 54" FRP Sewer and associated structures along the Santa Ana River <br />to replace the aging existing 42" Interceptor Sewer. Open cut Installations range from 1 V to Whoop along the existing <br />levee roads. There Is also 2,808 -If of 84" RCP casing installed via Slurry Microtunneling method, up to ten <br />tunneling shafts at depths to 70' deep, concrete inlet and outlet structures, a below ground metering station, and elaborate <br />dewatedng system. This highly orchestrated project includes mitigation measures for wild life, native plants and birds, <br />bicyclists, and campers within the project site <br />LOS ANGELES WORLD AIRPORT Los Angeles, Ca March 13 $30,000,000 <br />Tyler Chappell (310) 351 -5907 <br />Central Utility Plant Replacement Project <br />Construct chilled water supply and return lines, hot water supply and return lines, domestic water supply, reclaimed water <br />supply, underground power and communication systems to supped the new Central Utlllty Plant (CUP) In the wards 61h <br />busiest airport. Project includes providing BIM modeling for all portions of the underground work, excavation and the <br />installation of beam and plate shoring for the majonly of the 18 miles of total new piping installation, Other work includes <br />cast in place vaults, extensive traffic control, tunneling underneath word way Into the new Tom Bradley International <br />Terminal and asphalt restoration. <br />CALLEGUAS MUNICIPAL WATER DISTRICT Moorpark, Ca Oecembervl2 $6,275,000 <br />Shonna Summer, P.E. (805) 579 -7156 <br />Emergency Pipe Procurement and Storage <br />Procurement of emergency steel pipe, liners, cylinders, fittings, and appurtenances varying in size from 14" diameter to 72" <br />diameter to be stored onsite for future emergency repairs to Calleguas MIND facilities This work also Includes site work and <br />grading to place and bury selected pipe and filings underground for storage, above ground cylinder storage bays, and <br />construction ofaprefabricated metal building warehouse, <br />YUCAIPA VALLEY WATER DISTRICT San Bemerdino, Ca August-18 $9,350,000 <br />Brent Anton (009) 797 -5118 <br />Yucaipa Valley Regional 8dneline Extension Phase 3 <br />Construction of 24,40Ddf of 20" HOPE birr ins throughout three cities Through existing streets, right-of-ways, and beneath <br />two waterways. In addition 2,300 -If of 20" HDPE to be installed via directional calling under San Topics Creek and the <br />Santa Ana River at depths jilietler than 65' deep and 1,800 -If of20 "HOPE to be installed via jacked casing In six locations. <br />L.A. COUNTY DEPARTMENT OF PUBLIC WORKS Lang Beach, Ca January,12 $24,256,012 <br />Ali Zadeh (626) 4563104 <br />Termino Avenue Drain <br />The installation of 6,300 linear feet of Cast -In -Place and Precast Reinforced Concrete Box Culvm ranging in sizes up to <br />Double 9'wx 8'h; 8,800 linear feet of 72" to 18" RCP Storm Drain Piping, 1.200 linear feet of 78" Direct Jack and Bare RCP, <br />and over 100 Catch Basins equipped Win trash excluder screens and filtration, Other work includes construction of a Low <br />Flow Diversion Structure to capture and divert non -storm event runoff to existing sewers, installation of a temporary Sheet <br />Pile Cofferdam, utilization of a groundwater treatment system capable of treating over 1.1 MGD, and removal and <br />reatment of 6,900 tans of hvdrocarbon contaminated soils,. <br />LDS NGEtE8 DEPARTMENT of WATER &POWER Los Angeles, Ca anticipated $18,135,518 <br />Charas Ngo (213) 3672319 <br />River Supply Conduit - Unit 3 March42 <br />The installation of 11,200 linear feet of 96" CML&C steel pipe utilizing hydraulic pressed In sheet pile to protect the existing <br />1940's vintage 66" RCP was dine running parallel to the proposed pipeline. The project will also require 1,400 linear feel <br />of 108' diameter jacked steel cast , three concrete vaults and a 220 fool deep anode ground bed. <br />25H -60 <br />