Laserfiche WebLink
W.A. RABIC CONSTRUCTION COMPANY, INC. <br />REFERENCES <br />OWNERIAGENCY LOCATION DATE CONTRACT <br />CONTACT <br />COMPLETED AMOUNT <br />NAME PHONE <br />LOS ANGELES DEPARTMENT of WATER & POWER Los Angeles, Ca March -12 $38,703,497 <br />Ali Sabouni, P.E. (213) 367.2637 <br />City Trunk Line South - Unit 2 <br />The installation of 10,400 linear feet of 66 "CML &C steel pipe. The majority of the pipeline will be Installed via open Cut <br />me8wds and 2,100 linear feat will be Installed by tunneling utilizing an earth pressure balance machine (EPBM) at 78" <br />diameter.. The entire open cut installation will be installed utilizing solid sheet ahohng and hydraulically pressed In sheet <br />pile. Pipeline and tunnel construction up to depths of 40', The progress of the work will be controlled via a City mandated <br />meuix of 8 hirefter, shotdawas, 7 flared sequences; Including 32 work areas and various lie-'m connections. <br />EASTERN MUNICIPAL WATER DISTRICT Models, Ca Agnl40 $5,036,708 <br />Gabe Necochea, P.E, (951) 9283T77 <br />Murrlata Area Sewer Improvement Project <br />x 4475 <br />The rehabilitation of 5.800 linear feet of existing 12" and 15" VCP gravity sewer by ullllzing the pipe bursting method. The <br />Fax (951) 928 -6111 <br />pipe will be replaced by pneumatically bursting the existing pipe and then winching In a new 20" HOPE pipe. The pipeline <br />alfgnment transverses sensitive biological and environmental areas requiring multi- agency cooperation. Otherwork <br />Includes sewerb rising, replacing sewer manholes, extensive dewatedn and treatmentand roadwa restoratlon, <br />LOSANGELES CQUNTY SANITATION DISTRICT Cemon, Ga November -m $21,350,586 <br />Russ Vold is (310) 830 -6050 <br />Joldt Outfalf "C" Unit 1 Relief Trunk Sewer, Phase 1 <br />The installation of 41400 linear feet of 90" PVC Lined RCP Sewer placed In a 124ciot diameter dh-and -lag tunnel and <br />1,200 linear feat Installed by open cut method to depths ranging from 20-30' feet deep, Other work Includes 400 Inear <br />feet of 10" Jet Fuel line relocation to accommodate the deep tunneling shafts as well as the installation of cost in place <br />concrete Junction Structures, Angle Point Structures, manholes, live sewer tie-ins, and restoratlon ofaxlalln Imevernanta. <br />CITY OF ANAHEIM Anaheim, Ca November -08 $3,900A00 <br />Caster Williams (714) 766-5176 <br />City Switching Stations No. 10, 11, and 12. <br />The installation of 12,200 linear feet of encased 121kv duct bank and 17 Pre -cast structures, Other work included removal <br />and replacement of the asphalt roadway and concrete restoration. The project required multiple headings, mutiple <br />shifts and cocrdlna0on with the Dlannyleod Resort as well as Calhsns. <br />JOHNSON-PELTIER E ECTRIC Anaheim, Ca November 0B $4,600,000 <br />Tam Fuetle (502) 944 -3406 <br />1211 Upgrade at the Disneyland Resort <br />The installation of 10,000 linear feet of duct bank, associated grounding grid as well as 30 precast eiecthcal structures, <br />concrete, equipment pads, relocation of various ufiiities to facilitate precast structure Installation, and restoration of existing <br />Improvements throughootthe Disn land Resort <br />METROPOLITAN WATER DISTRICT Perils, Ca December 05 $40,700,918 <br />Wally Lieu (213)435 -2727 <br />PERRIS VALLEYPIPELINE- NORTH REACH <br />'rho installation of 2.7 miles of owner furnished 96" and 106" Steel Pipe at depths up to 60' deep. Other work includes <br />beat in place concrete vaults, butterfly valves, flow meters, tunneling through solid rack, extensive rock removal and <br />blissfinflu dewated , blow -of anjair vac installat ion, and complain roadway removal and replacement <br />EASTERN MUNICIPAL WATER DSTRICT Marano Valley, Ca Nov -08 $5,60%000 <br />Kad Roland (951) 928 -3777 <br />CACTUSAVE FEEDER PROJECT <br />x 4442 <br />The Installation of 2.6 miles of EMWD Furnished 48" Steel Pipe. Other work Includes the installation of 48" Butterfly Valves, <br />Fex(951) 928-6111 <br />COL <br />640 linear fee! of 66" Casing tig Bore and Jack Operation, Air Releases, and Blow -Off Installation. <br />EASTERN MUNI <br />EASTERN WATER DISTRICT Temecula, OR Apr -08 $3,469,904 <br />Bruce Ross (961) 9283777 <br />OESIGN•8Ul -DIA2 FORCE MAIN EMERGENCY REPLACEMENT <br />x 4451 <br />Provided engineering design and installation of 6,400 I.J. of 24" PVC Farce Main. Other work Included the installation of a <br />Fax (951) 926 -6111 <br />dowalo6m; system, Installing 320 feet of 60" casing by bore and sok malhod, sewer b� • satin , and me restoration <br />EASTERN MUNICIPAL WATER DISTRICT BANJACINTO August -O6 10;021,745 <br />Gabe Necochea, RE: (951) 928-3717 <br />NORTH SAN JACINTO SEWER PHASE 11 <br />x 4475 <br />The installation of 3,500 LF of 24" & 27" Amitech Polycres Pipe by Microtunneling, 4,500 LF of i8" & 24" PVC <br />Fax (951) 928 111 <br />pipe byopeh Cut Instaiiaflon, Beam & Plate Shortng, Extensive Dewaladng and Sewer By- Passing <br />METROPOLITAN WATER DISTRICT Parts, Ca to Jun -07 .$10,822,990 <br />Wally Lieu (213)435.2727 <br />COLORADO RIVER AQUEDUCTREHABILITATION Parker, AZ <br />UBlized 200 W.A. Rasic Employees to Dowell 150 Million Gallons of Water from the Colorado River Aqueduct <br />to facilitate the installation of 50 mechanical blow -offs, abandoning 27 banslfien drains, rehabilitate and recoat <br />We radial gates, Install how metering system at Capper Basin Inlet tunnel, and provide access for inspection <br />of siphons 6 MWD Impactors. <br />EASTERN MUNICIPAL WATER DISTRICT I YEAGER SKANSKA TEMECULA Jul-07 $1,982,282 <br />Armando Arroyo, P.E. (951) 928 -3777 <br />TEMECULA EDUCATION CENTER <br />Fax (951) 920.6111 <br />Install 900 LF of 36" Hobas Pipe, Trench Dowshark ; Bean & Plate &hods , Sewer B -Passin <br />McCARTBY BUILDING COMPANIES I CITY OF LOS ANGELES LOS ANGELES Jul 07 .2,672,715 <br />Rob Ragland, P.E. (949) 851 -8383 <br />VERMONT MANCHESTER SEWER PROJECT <br />Fax (949) 851.8398 <br />First open out Hobas Pipe Installation project ever performed in the City of Los Angeles <br />Install 1300 LF of 27 "1 Sewer Pipa, Lateral Insiod 0oq &Sewer Gq- Poseng <br />LONG BEACH WATER DEPARTMENT LONGEEACH Ju1707 $3,229,000 <br />Isaac Pal, P.E. (562)570.2330 <br />DIVISION STREETSEWER IMPROVEMENT <br />- F.(562)570 -2330 <br />Install 5,000 Lf. of 12" DIP Fnrce Main & 1,100 Lf. of 18" VCP; Extensive Dawakring <br />INLAND MPIRE UTILITIESAGENCY ONTARIO Jull $5,121,067 <br />Scott Johnson (909) 9931825 <br />SANANTONIO CHANNEL PIPELINE - SEGMENT A <br />Fax (909) 597 -BB75 <br />Install 15,000 Lf. of 24" CML&C Steel Pipe <br />25H -61 <br />