Laserfiche WebLink
The repair and construction of water mains (various materials including concrete cylinder and CML &C <br />steel) ranging from 4" to 30" in diameter and related appurtenances. <br />a. The repair and construction of system valves <br />b. The repair and construction of pressure reducing valves <br />c. The repair and construction of fire hydrants <br />d. Dewatering of excavations <br />e. Traffic Control <br />f. Disinfection and flushing <br />g. Site remediation and cleaning <br />3. The repair and construction of water and sewer pump stations and related appurtenances which may <br />include mechanical, electrical and piping components. <br />III. SUBCONTRACTORS <br />The use of Subcontractors is allowed but will require approval by City prior to start of any assigned <br />work. When a Subcontractor performs all or any part of the work, a markup shall be applied to the <br />Subcontractor's actual cost of such work. The Contractor may add a markup of 10 percent on the first <br />$5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in <br />excess of $5,000 of the subcontracted portion of the work. <br />RFP #14 -044 — On -Call Emergency Sewer and Water System Repair Services <br />251421162 <br />