Laserfiche WebLink
M Treatment Facilities <br />The Green Acres Project consists of construction of an <br />influent pump station to deliver secondary treated <br />wastewater produced by the Orange County Sanitation <br />Districts' Treatment Plant No. 1 to the Orange County <br />Water District (OCWD), located at its Water Factory 21 <br />(WF21) facility in Fountain Valley. There the secondary <br />effluent will receive further chemical treatment by the <br />addition of chemicals for flocculation prior to gravity, <br />filtration. The filtered secondary effluent will then <br />receive chlorination before being pumped from the WF21 <br />site to the various user locations. A 3.4 million gallon <br />reservoir and treated water pumping station will also be <br />constructed at WF21 to provide the most efficient and <br />reliable delivery' of seasonally variable flow. The <br />initial design plant capacity is 7.5 mgd or 8,400 acre- <br />feet/year. <br />• Distribution System <br />The capacity of the distribution system, identified by <br />the heavy black line in Exhibit "B", is 15 mgd in order <br />to meet the nightly peak pumping schedule. It consists <br />