Laserfiche WebLink
of approximately 24.6 miles of 14 to 42 inch diameter <br />pipelines. <br />& user Facilities <br />The expected project demand is approximately 7,000 acre- <br />feet/year., At present, over seventy individual users <br />have been identified. Seven of these major users have <br />their own on-site storage and require minimum pressure. <br />The remaining users are connected directly to the <br />purveyor's transmission line, and have no on-site <br />storage. As part of the project, the service connections <br />for the users will be constructed. <br />IWIM <br />