My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - CONSTRUCTION SUPPORT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/07/2014
>
25F - AGMT - CONSTRUCTION SUPPORT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2014 4:09:04 PM
Creation date
10/2/2014 3:34:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
10/7/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rudolfo Rosas <br />August 25, 2014 <br />Page 2 <br />1. Building location: minor adjustment to building location to provide adequate traffic control <br />during construction. <br />m. Code update - structural: update the structural plans and specifications for 2013 CBC. <br />n. Site modifications: confirm fire truck access, addition of gates, and minor modifications. <br />o. Electrical modifications: perform electrical coordination studies — load flow; short circuit <br />study; coordination study; and arc flash study. <br />p. Control strategy coordination: coordinate work with Enterprise Automation, including <br />attendance at meetings and workshops. <br />q. Generator: confirm sizing of generator for full -start capacity. <br />r. Dual force main: prepare exhibits for a dual force main plan, profile and details. <br />s. Traffic control concepts: review traffic control concepts with the EIR documentation. <br />t. OCSD coordination: update the requirements for connecting to the OCSD trunk sewer and <br />obtain the necessary approval from OCSD. <br />Task 2: Update Plans <br />Tetra Tech will update the construction plans based on the revised design criteria agreed upon with the <br />City. The following is a summary of the plan sheets that will be changed and whether the change is <br />minor, major or basically new. <br />• General Sheets: Update G -1, G -2 and G -3 (minor). <br />• C -1 (Demolition Plan) — add notes on access (minor) <br />• C -2 and C -3 (10" FM & 15" S Plan & Profile) — add driveways, traffic control concepts and <br />access notes (minor). <br />• C -4 (Bristol 15" S) — add driveways, traffic control concepts and access (minor). <br />• C -5 (Site Demo Plan) — add temporary const. easement requirements and restrictions (minor). <br />• C -6 (Site Plan) — modify as required to meet fire access requirements, moving of building, and <br />gates (more than minor but not major). <br />• C -7 (Site Piping Plan) — relocate RPPD for interior piping (minor). <br />• M -1 (Control Room) — add window between MCC and stairwary, duct coating, wet well roof <br />changes (minor). <br />• M -2, M -3 & M -4 (Dry Well) — modify clearances to pick up about one foot, modifications to <br />pump, grinder, meter, add platform, stairway modifications, valves, check valy, etc. (major). <br />• M -5 — Odor control plan, section and details (new) <br />• D -I (Connection Details) — add sequencing and traffic concept/access notes (minor). <br />• D -2 (Trench Details) — modify per EIR (minor). <br />• D -3 (Misc. Details) — modify Detail 2 (radar), Detail 3 (wet well level float), Detail 6 (sump) <br />and Detail 7 (dry well washdown) (major). <br />• D -4 (Misc Details) — Detail 2 (drain valve) (minor). <br />• S -1, and S -2 — update to 2013 CBC (minor). <br />• S -3 (Foundation Plan) — modify stairway, epoxy coating of floor and add platform (major). <br />
The URL can be used to link to this page
Your browser does not support the video tag.