My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - CONSTRUCTION SUPPORT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/07/2014
>
25F - AGMT - CONSTRUCTION SUPPORT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2014 4:09:04 PM
Creation date
10/2/2014 3:34:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
10/7/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rudolfo Rosas <br />August 25, 2014 <br />Page 3 <br />• S-4 (Ground Floor) — add window and any building size change (minor). <br />• S -6 (Section A) —revise stairway (major). <br />• S -7 (Section B) — call out removable mansard (minor). <br />• S -8 (Exterior Elevations) — add removable mansard and minor changes (minor). <br />• S -11 (Structural Details) — minor changes (minor) <br />• S -12 and S -13 (Mansard Details) — modifications due to removal mansard (minor). <br />• S -14 (Stair) — modifications due to new stairway (major). <br />• S -15 (Removable Mansard Details (new). <br />• S -16 (Mag Meter Platform Framing Plan & Details (new). <br />• E -1 & E -2 (Electrical Site Plan and Diagrams) — minor updates (minor). <br />• E -3 (Power Plan) — add disconnect switches, flood switches, grinder conduits, wet well signal <br />in dry well, etc. (major). <br />• E-4 (Lighting and Grounding) — minor upgrades (minor). <br />• E -5 & E -6 (Schedules and Schematics) — upgrade per comments (minor). <br />• Update the landscaping and irrigation plans (minor) <br />Tetra Tech will coordinate with the City staff all necessary City permits. We have included within this <br />proposal provisions for plan revisions, clarifications, meetings and time constraints necessary to obtain <br />any City Building and Electrical Permits. The City will be responsible for processing the plans with <br />the City departments for all necessary City permits. <br />Task 3: Update Specifications and Estimates <br />Tetra Tech will update the specifications for modifications based on the EIR as well as the City <br />comments to the plans. The Contract Documents will need to be updated due to delay. Section 01010 <br />will need to be revised to be consistent with the EIR and the traffic concepts included in the EIR. The <br />following technical specifications will need to be modified: demolition; dewatering; instrumentation <br />and monitoring; cast -in -place concrete; epoxy coating of the floor; ventilation equipment; odor control <br />facilities; sewage grinders; pumps; check valves; manual valves; meters; VFD; and electrical <br />components. Update the cost estimates based on the updated plans. <br />Task 4: PLC Panel Design and Control Strategies (Enterprise Automation) <br />Enterprise Automation will provide specifications and drawings for the functional automation system <br />to be included within the contract documents for the San Lorenzo Lift Station. In addition to providing <br />a functional automation system, Enterprise Automation will also: continue the process of developing <br />documentation formats and standards that can be re -used on future City projects; ensure that the City's <br />control requirements for the City are documented and implemented; ensure that the facility operates as <br />intended by the City; and ensure that as -built documentation for the control descriptions and PLC panel <br />are provided at the conclusion of the construction. <br />The following scope of work includes design phase activities and construction phase activities <br />"�"_f2iK <br />
The URL can be used to link to this page
Your browser does not support the video tag.