Laserfiche WebLink
Sex1inger Farmhouse and Orchard <br />Residential Development Project <br />CEQA Findings <br />increase demand on the local water system, however the net increase would not be <br />significant. Therefore, no water or wastewater facilities, or expansion of existing <br />facilities, would be required and impacts are less than significant. (EIR, pp. 5 -99 through <br />5 -101; January 2014 EIR Attachment, p. 9.) <br />3. Impact: Would the project require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, the construction of which could <br />cause significant environmental effects? <br />Finding: Less Than Significant'.. (EIR, pp. 5.99 through 5 -101; January 2014 EIR <br />Attachment, p. 9.) <br />Analysis: The project would increase impervious surfaces at the project site, resulting in <br />a 25 year runoff of approximately 4.7 cfs and 7.8 cfs, at different locations. A hydrology <br />technical report was completed for the project, and concluded that the flows from the <br />proposed project as compared with the existing conditions at the site is minor and would <br />not exceed the capacity of any street or adjacent storm drain facility downstream of the <br />project. Therefore, impacts would be less than significant. (EIR, pp. 5 -53, 5 -54; January <br />2014 EIR Attachment, 7.) <br />4. Impact: Would the project result in insufficient water supplies being available to service <br />the project from existing entitlements and resources? <br />Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR <br />Attachment, p. 9.) <br />The City is served by its own municipal water system, with the majority of the water <br />supply obtained from groundwater and the remainder purchased from imported sources. <br />The project would increase demand on the local water system, however the net increase <br />would not be significant. Therefore, no water or wastewater facilities, or expansion of <br />existing facilities, would be required and impacts are less than significant. (EIR, pp. 5 -99 <br />through 5 -101; January 2014 EIR Attachment, p. 9.) <br />5. Impact: Would the project result in a determination by the wastewater treatment provider <br />which services or may serve the project that it has inadequate capacity to serve the <br />project's projected demand in addition to the provider's existing commitments? <br />Finding: Less Than Significant. (EIR, pp. 5 -99 through 5 -101; January 2014 EIR <br />Attachment, p. 9.) <br />Analysis: OCSD is the service agency providing wastewater treatment for the City. The <br />OCSD treatment plant has capacity to serve the project's projected wastewater <br />generation, which is 7,440 gallons per day or less. Therefore, impact would be less than <br />significant. (EIR, p. 5 -100.) <br />19 "Exhibit A" <br />